=== 2018/4/11(Wed.) === * Remote participants by eZuce: None ==== Report of work (*:responsible person) ==== * IFO: Enomoto, Nagano, Nagano * RF signal was extracted from fringe of Michelson. * Ratio of ETMY and ETMX is not so large, roughly 1:1. * We need more damping for both ETMY and ETMX. * 4 front gate valve will be open. * Power of coil driver is too small at ETMX marionette damping. It will be exchanged to HPCD. * Camera: Yokozawa * Illuminator at X end chamber was installed. * DAQ: Miyakawa, Yamamoto * k1tw0 started writing minute raw data. ==== Work plan (*:responsible person) ==== * Camera: Inoue, Yokozawa * We check that nothing blocks the beam between EXA and EXC. * DAQ: *Miyakawa * Preparation to move writing minute raw of k1fw1 to a new k1tw1. ==== Laser hazard ==== * [AM] * IR: PSL, Yend 1F * Green: off * [PM] * IR: PSL, Yend 1F * Green: off * [night] * IR: Upstream SR2-3 line, Yend 1F * Green: off ==== Weekly ==== * week of 4/9 * 4/11 12:30 at fan hut: Meeting before pump down 2 * Closing EXC * Some controls for Michelson * 4/13~ Pump down * week of 4/16 * Michelson control * Leak check * week of 4/23 * Operation ==== Issues ====