=== 2019/1/9(Wed.) === === Weekend === ==== Transition from morning work (*:responsible person) ==== * ICRR network is still not stable. * RT model for SRM is down from yesterday. It will be fixed in the morning. If need to look at, it will be afternoon. ==== Report of work (*:responsible person) ==== * MIR: First contact was put on MC mirrors yesterday. It will be removed tomorrow. * IOO: MZ common mode servo was installed. ==== Work plan (*:responsible person) ==== * PEM: One of the out put of SR3 DAC was connected to PEM signal. * VAC: IXC is being vented. Fabian will look the drift and compensate if needed. * IOO: Noise measurement for optical fiber for green.