Differences between revisions 2 and 3
Revision 2 as of 2019-01-24 10:31:35
Size: 2018
Comment:
Revision 3 as of 2019-01-24 10:33:05
Size: 2017
Comment:
Deletions are marked like this. Additions are marked like this.
Line 16: Line 16:
  * 1/24 ITMY is aligned to REFL by IR.   * 1/24-25 ITMY is aligned to REFL by IR.
Line 18: Line 18:

* 1/26 Beam position of IR at SR3 will be confirmed how far from the center.
  * 1/24-25 Beam position of IR at SR3 is confirmed how far from the center.

2019/1/24(Thur.)

Weekend

  • Sat: Nakano, Enomoto, Guiguo, Yokozawa, Sugimoto
  • Sun: Nakano, Enomoto, Guiguo, Yokozawa

Transition from morning work (*:responsible person)

  • Schedule
    • Current status as of 1/22: IR and Green reached X end PD.
    • 1/22 Surface inspection for PR mirrors. Cleaning will be done after 1/31.

    • 1/22 or 23 Surface inspection for SR mirrors.

    • 1/24-25 Cleaning HR of SRs.
    • 1/23 BS is aligned to Y-end PD by IR.

    • 1/24-25 ITMY is aligned to REFL by IR.
    • 1/24-25 ITMX is aligned to REFL by IR.
    • 1/24-25 Beam position of IR at SR3 is confirmed how far from the center.
    • 1/28-29 SR3 is aligned to SR2 center by IR.
    • 1/30 Green beam is injected from SR2 AR surface to Y end PD.
    • 1/31-2/1 Removing bellows at PR and SR area.
    • 1/31-2/1 Cleaning HR of PR3 and AR of SR2
    • 2/4-8 Alignment of SR2 -> SRM by IR, SRM -> OMMT by IR -> OMMT -> OSTM by IR, OSTM -> OMC by IR

    • 2/4-8 Alignment of ETMY -> POS by Green

    • 2/12-15 Closing door for central area, pumping down
      • needs drift monitor for VIS

Report of work (*:responsible person)

  • COM: IR beam reached at Y end
    • We checked Y-end PDA
    • Green beam for X arm was used for rough alignment of BS to center at ITMY
    • Then IR beam hit the Y end.
  • Type A:
    • IP position of ITMY is somehow OK, but stepping motor of BF or is not working well.
    • IP of ETMY is locked yesterday.
  • TYPE B: GEO phone amp was replaced and it seems to be fine. We need a little more time to replace other GEO phone.
  • MIR: HR of SRM cleaning is going on yesterday and today, HR of SR3 is the next.
  • DGS: RFM network is available for both X and Y arm.
    • CAM: k1cam0 was recovered.
  • OMC: It was found that the beam is blocked by Type C OSEM. We need some modifications at the frame.

Work plan (*:responsible person)

  • COM: Alignment of ITMY today.
  • Type A: Releasing ETMY lock.

KAGRA/Commissioning/DailyWork/2019-01-24 (last edited 2019-01-24 10:33:05 by OsamuMiyakawa)