=== 2019/2/8(Fri.) === === Weekend === * Sat: Michimura, Enomoto, Somiya(3) * Sun: Enomoto, Somiya(3) * Mon: Enomoto, Somiya(3) === Schedule === * Current status as of 1/22: IR and Green reached X end PD. * --(1/22: Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31. * --(1/23: Surface inspection for SR mirrors.)-- * --(1/24-25: Cleaning HR of SR3, SRM.)-- * --(1/23: BS is aligned to Y-end PD by IR.)-- * --(1/27: ITMY is aligned to REFL by IR.)-- * --(1/27: ITMX is aligned to REFL by IR.)-- * --(1/27: Beam position of IR at SR3 is confirmed how far from the center.)-- * --(1/28-29: SR3 is aligned to SR2 center by IR.)-- * --(1/28: Alignment of SR2 -> SRM by IR.)-- * --(1/29: Green beam is injected from SR2 AR surface to Y end PD.)-- * --(1/31: Removing bellows at PR and SR area.)-- * --(1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2)-- * --(2/5: Alignment of SRM to OMMT1 by IR)-- * --(2/6: Alignment of ETMY -> POS by Green)-- * 2/7-8: OMMT -> OSTM by IR, OSTM -> OMC by IR * 2/12-15: Closing door for central area, pumping down * needs drift monitor for VIS ==== Note ==== * Report all the wrok to klog, and gokagra ML if urgent things. * If you work other location from where it was confirmed at the morning meeting, please contact related poeple. ==== Report of work ==== * Type B and COM: SR3 oplev loop was implemented and improved. Motion is much smaller now and it will help alignment work. * we saw some oscillation aound 10~Hz * CAM: GigE camera at POS table to see SR2. * AOS: TMSY got signal of green at QPD and PD. * FCL: temperature is between 24-25 degree. Temperature at SR2 is something strange. ==== Work plan ==== * MIR: inspection will be done * AOS: Transportation of NAB in X arm from 11am. * AOS: We will check BS oplev coupling issue. * Type B: One of SRM OSEM is close to edge of range. We will fix it today.