Differences between revisions 4 and 5
Revision 4 as of 2019-04-08 13:07:36
Size: 1888
Comment:
Revision 5 as of 2019-04-08 18:01:52
Size: 1876
Comment:
Deletions are marked like this. Additions are marked like this.
Line 24: Line 24:
  * --(4/8: Leak check)--
  * --(4/9-10: venting)--
  * 4/8: Leak check
  * 4/9-10: venting

2019/4/8(Mon.)

Schedule

  • Center
    • 3/25: Venting

    • 3/27-4/9: Fixing PR2
      • 4/4 -4/5: Gluing

      • 4/8: alignment check
      • 4/8-9: OSEM adjustment
    • 4/10-11: Closing
    • 4/12: Pump down
    • 4/15~: Leak check
  • ITMX:
    • 3/19: Cooling stop

    • 3/25: Venting start

    • 3/27: Opning chamber

    • 3/27~: Fixing thermal touch

    • 4/2~: closing chamber and start pumping down

    • 4/12: Cooling starts.
  • Xend
    • 3/25: closing and pump down

    • 4/8: Leak check
    • 4/9-10: venting
    • 4/11: Exchange a broken LED for Photo sensor
    • 4/12: closing chamber and start pumping down
    • 4/15: Leak check
    • 4/19(or 22): Cooling start
  • Yend
    • 3/26: Venting start

    • 3/28~: Fixing short inside chamber

    • 4/3: Fixing F0 actuator

    • 4/4~: closing chamber and start pumping down.

    • 4/12: Cooling starts.
  • 4/8: Daily meeting will be moved to 1PM
    • Summary of work will last for a while in the morning meeting.
  • April: Measurement of TF, payload diagonalization on ITMX
  • End of April~: DRMI commissioning
  • End of April~: Y arm commissioning
  • ~End of May: FPMI commissioning

Note

  • Commissioning meeting moves at 1PM from today.

Night work

  • IOO: iMC alignment (Kokeyama, Guiguo)

Weekend

Report of work

  • Type Bp: Jig for 3 flags were removed successfully, and PR2 and PRM are centered.
  • ITMX has no signal on oplev.
  • CRY: ETMX PD sensor was fixed on Thurturday.
  • Type B: SR2 TF looked healthy on Thursday.
  • Type A: ETMY TF looked healthy on Saturday.
  • CRY: ITMY was cooled to 20K.

Work plan

  • MIF: IFO alignment will be checked this morning.
  • IOO ASC work in the night time.
    • June-gyu Park will join from today.

KAGRA/Commissioning/DailyWork/2019-04-08 (last edited 2019-04-09 09:08:33 by OsamuMiyakawa)