=== 2019/5/21(Tue.) === ==== Schedule ==== * 5/17~ increasing ETMY temperature. * 5/20-24: Exchanging cryo valves. * 5/22: RT PC maintenance -> please go to the safe mode for all VIS connected Dolphin (BS) * Xend * --(5/2: Cooling start)-- * 5/29: Cooling done * End of April~: Y arm commissioning * ~End of May: Y arm and FPMI commissioning ==== Note ==== * There was request to CRY people to attend the morning or noon meeting. * CRY: Exchanging cryo valve during this week. ==== Night work ==== ==== Weekend ==== ==== Report of work ==== * COM: Finesse measurement: * Yarm 131, ITMY temperature 25K, ETMY temperature 60K * Xarm 1151, ITMY temperature 29K, ETMY temperature 126K, but alignment at ETMX ==== Work plan ==== * VAC: Measurement of height of ETMY by Suzuki-san.