=== 2019/6/21(Fri.) === ==== Schedule ==== * --(5/22-23: MZ release from PSL)-- * --(5/20-24: Exchanging cryo valves.)-- * --(5/27-6/2: Y arm mass lock.)-- (not done yet) * --(5/29: RT PC maintenance -> go to safe mode for all VIS connected Dolphin (specially BS) )-- * --(6/3-6/8: Installation of TMS for ETMY)-- * --(6/8: Engineering run)-- * --(6/18 Move PR3)-- * 6/19 DRMI locked. * ITMX * ETMX * 6/21: Stop cooler. * ITMY * ETMY * 6/20: Stop cooler * 7/1: Open chamber * Long term: * --(4/22-5/31: Yarm commissioning)-- * 5/27-6/30: DRMI commissioning * 7/1-8/9: DRFPMI commissioning * 8/12-10/4: DRFPMI ASC * 10/7-11/15: Post Commissioning * 11/18-12/13: Noise hunting ==== Note ==== * Please reduce the number or speed of 16kHz channels. ==== Night work ==== ==== Weekend ==== ==== Report of work ==== * Type A, CRY: Because of slipping something ETMY did not come back, so we started warming up to open the chamber. * Open day of ETMY chamber will be the next Friday. * COM: Clipping was found in the PRMI cavity. It was about ~25%. * ETMX outgas is increasing. We decided to stop cooler. ==== Work plan ==== * Calibration of DRMI will be tested.