=== 2019/6/25(Tue.) === ==== Schedule ==== * --(6/18 Move PR3)-- * 6/19 DRMI locked. * 621: polarization issue found. * ITMX * ETMX * 6/21: Stop cooler. * ITMY * ETMY * 6/20: Stop cooler * 7/1: Open chamber * Long term: * --(4/22-5/31: Yarm commissioning)-- * 5/27-6/30: DRMI commissioning * 7/1-8/9: DRFPMI commissioning * 8/12-10/4: DRFPMI ASC * 10/7-11/15: Post Commissioning * 11/18-12/13: Noise hunting ==== Note ==== * Please reduce the number or speed of 16kHz channels. ==== Night work ==== ==== Weekend ==== ==== Report of work ==== * Type A: working on ITMX and ETMX. Some of peaks were damped, but some of them were not. Needs more time. ==== Work plan ====