=== 2019/7/3(Wed.) === ==== Schedule ==== * --(6/18 Move PR3)-- * 6/19: DRMI locked. * 6/21: polarization issue found. * ITMX * ETMX * 6/21: Stop cooler. * ITMY * ETMY * 6/20: Stop cooler * 6/28: Open chamber * Long term: * --(4/22-5/31: Yarm commissioning)-- * --(5/27-6/30: DRMI commissioning)-- * 7/1-8/9: FPMI/DRFPMI commissioning * 8/12-10/4: ASC * 10/7-11/15: Post Commissioning * 11/18-12/13: Noise hunting ==== Note ==== * Please reduce the number or speed of 16kHz channels. ==== Night work ==== ==== Weekend ==== ==== Report of work ==== * COM: Cancellation of P-polarization by flipped carrier from arm cavity was seen. * PRXarm helped factor 3 for leaking to P-pol, it means 10% would be 3%. * CAL: MICH lock trial is going on for calibration. * CAL: Noise hunting for Xend and found 2 kinds of noise. * High frequency peak 1-4kHz depending time, and group connection. * Vibration from vacuum pump - > on/off test on Friday. * Y end work today for the same thing as X end. * Type A: ETMY was aligned yesterday. * VAC: * IP control of ETMY reached to the limit. * Type B: SRM oplev was tuned and fixed. * DMG: Fiber channel was installed to secand E18. ==== Work plan ==== * IOO: OMC work today. * DMG: no maintenance today, but some extra works are planned.