=== 2019/7/4(Thur.) === ==== Schedule ==== * * ITMX * ETMX * ITMY * 7/4: Turbo pump on * ETMY * 7/4: Turbo pump on * Long term: * --(4/22-5/31: Yarm commissioning)-- * --(5/27-6/30: DRMI commissioning)-- * 7/1-8/9: FPMI/DRFPMI commissioning * 8/12-10/4: ASC * 10/7-11/15: Post Commissioning * 11/18-12/13: Noise hunting ==== Note ==== * Please reduce the number or speed of 16kHz channels. * GV of BS side can be opened on 7/5, but still please do not oped are side. ==== Night work ==== ==== Weekend ==== ==== Report of work ==== * OMC: Transmissibility was too low ~30%. * Beam was blocked by on of the mirror mount. * Finesse was ~400, design ~800. * Needs calibrated PD. * COM: PRMI with 3f was tried and it worked. It was actually transition from 1f to 3f. * Some DRMI work. Lock lasted ~10min, it was very sensitive to alignment. * * ISS: Measured RIN with second loop on. * In-loop and out-loop noise were matched well. * Noise was 1e-7. * CAL: Upper beam of Pcal on ETMY was lost. It will be fixed soon. * VAC: Turbo pump tuned on for ITMY this morning and ETMY yesterday. * GV of BS side can be opened tomorrow, but still please do not oped are side. ==== Work plan ==== * Type B: some measurement will be done.