=== 2019/7/11(Thur.) === ==== Schedule ==== * ~7/31: Trial for DRMI with polarization. * 7/6~: Trial for mass lock * ITMX * ETMX * ITMY * 7/4: Turbo pump on * ETMY * 7/4: Turbo pump on * Long term: * --(4/22-5/31: Yarm commissioning)-- * --(5/27-6/30: DRMI commissioning)-- * 7/1-8/9: FPMI/DRFPMI commissioning * 8/12-10/4: ASC * 10/7-11/15: Post Commissioning * 11/18-12/13: Noise hunting ==== Note ==== * Please reduce the number or speed of 16kHz channels. * GV of BS side can be opened on 7/5, but still please do not oped are side. ==== Night work ==== ==== Weekend ==== ==== Report of work ==== * OMC: 700Hz oscillation comes from mechanical resonance of optical bread board. It was measured by accelerometer on the optical bread board. * It could be acoustic coupling, so pumping down may fix something. * OMC: Transmittance was 16% for input beam, 32% for TEM00, with sort of good alignment. Loss is 1% order inside. * Next week we may pull OMC. * COM: DC output of ASC PD had something wrong, and it was fixed on RT model. * VAC: GV were opened. Y arm can be tried tonight. * Type A was a lot better last night. Damping filter was modified at ETMY, <1urad. * Type B: SR3 has some big motion on yaw at 40mHz by ~6urad pp. * 5pm on Tuesday, PEM has a meeting with some interesting results. * DGS, AEL: SRM and SR3 18V was exchanged to the power supply from the computer room. * CAL: IMC whitening filter was engaged, but noise did not change. ==== Work plan ==== * MICH whitening fiter will be implemented soon for the engineering run this weekend.