Line 5: | Line 5: |
* Attendance: Miyakawa, Stefan, Aso, Nakano, Enomoto, Kozakai, Miyo, Yokozawa, Darkhan, Sugimoto, Yamada, Ushiba, Tomura * Zoom: Miyoki, Eleonora, Takahashi, Ryujin Kwak, Sawada, Oshino, Yamamoto, Hiro, Fujii, Uchiyama, Suzuki |
* Attendance: Miyakawa, Aso, Oshino, Ogaki, Kokeyama, Nakano, Enomoto, Kozakai, Miyoki, Miyo, Yokozawa, Haino, Suzuki, Koyama, Nakagawa, Tanaka, Sugimoto, Stefan * Zoom: Yokoyama, Youngmin, Inoue, Takahashi, Shoda, Uchiyama, Takeda, Akutsu, Yamada, Suzuki, Sawada |
Line 13: | Line 13: |
* Stable * PR3 troubles for the first 30 min, probably due to temperature. * PMC drift due to the temperature change |
* Lock was quite stable. * PR3 troubles for the first 30 min, probably due to temperature. * Oplev itself is something wrong, and PR3 is largest one. * PMC drift due to the temperature change, and out of the range of PZT lost lock. |
Line 17: | Line 19: |
* Green power was lower now, but not on Saturday, but on this week. |
|
Line 49: | Line 53: |
=== Next Run === | === Next Run === |
Line 53: | Line 57: |
* ITMY trouble? | |
Line 58: | Line 63: |
= Minute of temperature control meeting = ---- * Date: 2019/6/11 12:15~13:00 * Attendance: Miyakawa, Yokozawa, Enomoto, Nakano, Kokeyama, Miyoki, Aso, Sugimoto, Stefan * Zoom ----- === Memo === * Cause of instability in PSL. * Sensor position. * Not circulating well. * To do * Stopping Water cooler around MCE. * Move sensor position. * Stopping all AC in the PSL? -> temperature goes to more than 30deg. |
Minute of KAGRA ERun1 summary meeting
- Date: 2019/6/11 15:00~16:00
- Attendance: Miyakawa, Aso, Oshino, Ogaki, Kokeyama, Nakano, Enomoto, Kozakai, Miyoki, Miyo, Yokozawa, Haino, Suzuki, Koyama, Nakagawa, Tanaka, Sugimoto, Stefan
- Zoom: Yokoyama, Youngmin, Inoue, Takahashi, Shoda, Uchiyama, Takeda, Akutsu, Yamada, Suzuki, Sawada
Over all summary
- X arm lock
- Lock was quite stable.
- PR3 troubles for the first 30 min, probably due to temperature.
- Oplev itself is something wrong, and PR3 is largest one.
- PMC drift due to the temperature change, and out of the range of PZT lost lock.
- Green power was lower now, but not on Saturday, but on this week.
- First Sensitivity monitor
Parallel works during Run
- ETMY installation work
- DAQ trouble
Data
- Lock flag, Science mode, effective data
- Duty cycle
- Data rate
- Yokozawa will collect necessary data.
Action Items
- Long term temperature investigation
- Calibration for Mass lock
- Limited by ADC noise. Needs whitening filters.
- Noise hunting for frequency noise
- Needs MICH calibration.
- Gardian for DAQ
- Real time camera
- COM team should take a rest during Run.
- Needs shift ASAP
Next Run
- With LIGO commissioners.
- Saturday or Friday?
- 7/12 or 13.
- ITMY trouble?
Others
Minute of temperature control meeting
- Date: 2019/6/11 12:15~13:00
- Attendance: Miyakawa, Yokozawa, Enomoto, Nakano, Kokeyama, Miyoki, Aso, Sugimoto, Stefan
- Zoom
Memo
- Cause of instability in PSL.
- Sensor position.
- Not circulating well.
- To do
- Stopping Water cooler around MCE.
- Move sensor position.
Stopping all AC in the PSL? -> temperature goes to more than 30deg.