Line 5: Line 5:
 * Attendance: Miyakawa, Stefan, Aso, Nakano, Enomoto, Kozakai, Miyo, Yokozawa, Darkhan, Sugimoto, Yamada, Ushiba, Tomura
 * Zoom: Miyoki, Eleonora, Takahashi, Ryujin Kwak, Sawada, Oshino, Yamamoto, Hiro, Fujii, Uchiyama, Suzuki
 * Attendance: Miyakawa, Aso, Oshino, Ogaki, Kokeyama, Nakano, Enomoto, Kozakai, Miyoki, Miyo, Yokozawa, Haino, Suzuki, Koyama, Nakagawa, Tanaka, Sugimoto, Stefan
 * Zoom: Yokoyama, Youngmin, Inoue, Takahashi, Shoda, Uchiyama, Takeda, Akutsu, Yamada, Suzuki, Sawada
Line 13: Line 13:
 * Stable
* PR3 troubles for the first 30 min, probably due to temperature.
 * PMC drift due to the temperature change
  * Lock was quite stable.
 
* PR3 troubles for the first 30 min, probably due to temperature.
  * Oplev itself is something wrong, and PR3 is largest one.

 
* PMC drift due to the temperature change, and out of the range of PZT lost lock.
Line 17: Line 19:
 * Green power was lower now, but not on Saturday, but on this week.

Minute of KAGRA ERun1 summary meeting


  • Date: 2019/6/11 15:00~16:00
  • Attendance: Miyakawa, Aso, Oshino, Ogaki, Kokeyama, Nakano, Enomoto, Kozakai, Miyoki, Miyo, Yokozawa, Haino, Suzuki, Koyama, Nakagawa, Tanaka, Sugimoto, Stefan
  • Zoom: Yokoyama, Youngmin, Inoue, Takahashi, Shoda, Uchiyama, Takeda, Akutsu, Yamada, Suzuki, Sawada


Over all summary

  • X arm lock
    • Lock was quite stable.
    • PR3 troubles for the first 30 min, probably due to temperature.
    • Oplev itself is something wrong, and PR3 is largest one.
  • PMC drift due to the temperature change, and out of the range of PZT lost lock.
  • Green power was lower now, but not on Saturday, but on this week.
  • First Sensitivity monitor

Parallel works during Run

  • ETMY installation work
  • DAQ trouble

Data

  • Segment

  • Lock flag, Science mode, effective data
  • Duty cycle
  • Data rate
  • Yokozawa will collect necessary data.

Action Items

  • Long term temperature investigation
  • Calibration for Mass lock
  • Limited by ADC noise. Needs whitening filters.
  • Noise hunting for frequency noise
  • Needs MICH calibration.
  • Gardian for DAQ
  • Real time camera
  • COM team should take a rest during Run.
  • Needs shift ASAP

Next Run

  • With LIGO commissioners.
  • Saturday or Friday?
  • 7/12 or 13.
    • ITMY trouble?


Others