Commissioning Strategy Meeting (2023/2/17) ----- *3 months + 1 week to O4a start (24 May) *Golden Week holidays(3-7 May) *GWADW2023 (21-27 May) *Daily commissioning strategy is necessary! *More precise time sharing and assignments are necessary. *Can we work in KAGRA from am 5:00 ?? -> Consult with Ohashi-san *How much late is allowed in the night?? -> Consult with Ohashi-san *Topics on the sensitivity enhancement *Seismic noise isolation of OMC?? (~ 6 months??) *where is the noise due to the "normally expected" seismic noise? *Some selection *no opening vacuum tanks <- low seismic noise environment to realize 1-3Mpc *opening vacuum tanks <- if scattered light ? new injection path is also possible. *TMPs were off on OMC/SRM at present. *Seismic noise is still larger than O3GK now. * Can we reach the O3GK sensitivity level if we can realize the low seismic noise level? -> Washimi-kun -> We can reduce or not *If we open OMC, what should we check? *scattered light on the cable? that was identified by Akutsu-kun. *Bleade spring resonance? No data. *Up conversion noise implies scattered light noise? *OSTM swing to check the scattered lights? -> Ushiba *Slow actuation of suspension -> PEM team *Hummering/acoustic test? *stable noises also exist. *3 mirrors(IX, IY, EY) cooling(~2 months(assuming "1 month for one mirror" and "one cooling in one arm at the same time".) *How much commissioning time will be used for *suspension height adjustment *drifting *PY/L coupling adjustment *resonance mitigation control in -> minor adjustment is enough, mainly in gain. *What is the milestone * *Cryocooler effects is serious or not? According to Yamada-kun's thesis, no effect for the designed sensitivity. *We can check by just operating motors. *We get peak noises nad enhanced noises for the frequency range of 10~100Hz. *Seismic noise comparison? *Can we cool during O? *Control of PRFPMI+DC *ADS/ASC/WFS for arms to mitigate the contrast fluctuation -> Ushiba *mysterious off set problems *under investigation. *Check the TMSX to kill scattered light. *ETMY covering -> check effect *ADS in FPMI *Enhance OMC lock-acquire stability? *more guardian improvement(Ushiba, Aso) *More dynamic range of PNC-X? *Laser *HPL usage for IFO (120W to Toyama U, Characterized New 60W to KAGRA) *After noise-hunting *HPL in Toyama U (new 60W characterization -> KAGRA, Repair of 120W from KAGRA) *Laser power increase strategy -> Arm cavity instability mainly of Pitch. *Many measures were prepared. So this pitch can be suppressed. Not so serious. *What is the milestone to change HPL *1Mpc ? *noise budgeting? *PLL adjustment is bothering us!! *ISS * below 3Mpc line. However, bad alignment will produce a line noise. *Noise hunting, reduction, budgeting *MICH *noise budgeting is important. *PRCL *noise budgeting is important. *Suspension control around <100Hz for some suspensions *local control optimization(filter correction) to reduce the contrast fluctuation? -> Ushiba + alpha *no problem in IMC controls *we need a summary!!(http://172.16.34.76/past_data_viewer/fig_nb/2023/0215/noise_budget_2023-02-15_12:05:26.png) *upload this link in JGWdoc/Dac wiki? -> Yuzurihara-kun *Suspension control around the micro-seismic area *try the bottom filter dumper sensor correction in L *Terrence method trial in future *PEM/DetChar activities *Whitening filter apply *REFL power up *MISC *Remove unnecessary stuff from the isolated area, especially around OMC. -> Miyoki *OMC: some cabling should be reset. -> Miyoki *Environment cleaning. -> Miyoki *Topics on maintenance for the long operation *Vacuum stuff *Ion pump operation estimation -> Who (Kimura, next week) -> Next week schedule. * -> do as soon as possible. *TakahashiR-san maybe. + Takahashi-san, Yasui-san *Cryo-coolers *Air conditioning Coolers/heaters -. Miyoki *Seasonal water drainage *Yarm pumping mid March - mid May