Differences between revisions 1 and 13 (spanning 12 versions)
Revision 1 as of 2018-04-28 05:17:55
Size: 43
Comment:
Revision 13 as of 2018-06-26 10:55:35
Size: 1035
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.

== Important settings to remember ==

=== Commissioning related ===
||Channel Name ||Apr 28, 09:00- 2018 ||
||K1:GRD-LSC_MICH_STATE_N ||MICH lock status by GUARDIAN ||

=== LSC related ===
|| Channel Name || Apr 28, 09:00- 2018 ||
|| K1:LSC-MICH_IN1_DQ || error signal of MICH control ||
|| K1:LSC-MICH1_OUT_DQ || controls signal of MICH control ||
|| K1:LSC-REFLAIR_B_LF_DQ || DC signal of PD at REFLection port ||

=== Calibration related ===
||Channel Name ||Apr 28, 09:00- 2018 ||
||K1:CAL-CS_PROC_C00_STRAIN_DQ || h-of-t reconstruction 1/c v_err + A v_ctrl ||
||K1:CAL-CS_PROC_ERR_STRAIN_DQ || h-of-t reconstruction from error signal ||
||K1:CAL-CS_PROC_CTRL_STRAIN_DQ || h-of-t reconstruction from control signal ||

=== Channel summary ===
 [[attachment:bKAGRA_phase1_channel.pdf|横澤memo]]

Important Channels for bKAGRA Phase 1

Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.

Important settings to remember

Channel Name

Apr 28, 09:00- 2018

K1:GRD-LSC_MICH_STATE_N

MICH lock status by GUARDIAN

Channel Name

Apr 28, 09:00- 2018

K1:LSC-MICH_IN1_DQ

error signal of MICH control

K1:LSC-MICH1_OUT_DQ

controls signal of MICH control

K1:LSC-REFLAIR_B_LF_DQ

DC signal of PD at REFLection port

Channel Name

Apr 28, 09:00- 2018

K1:CAL-CS_PROC_C00_STRAIN_DQ

h-of-t reconstruction 1/c v_err + A v_ctrl

K1:CAL-CS_PROC_ERR_STRAIN_DQ

h-of-t reconstruction from error signal

K1:CAL-CS_PROC_CTRL_STRAIN_DQ

h-of-t reconstruction from control signal

Channel summary

KAGRA/Commissioning/Phase1/Operation/ChannelList (last edited 2018-06-26 10:55:35 by TakaakiYokozawa)