Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2018-04-28 05:17:55
Size: 43
Comment:
Revision 8 as of 2018-05-01 22:57:32
Size: 624
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.

== Important settings to remember ==

=== Commissioning related ===
||Channel Name ||Apr 28, 09:00- 2018 ||
||K1:GRD-PSL_STATE_N ||MICH lock status by GUARDIAN ||

=== LSC related ===
||Channel Name ||Apr 28, 09:00- 2018 ||
||K1:LSC-MICH_IN1_DQ || error signal of MICH control ||
||K1:LS-MICH2_OUT_DQ || controls signal of MICH control ||

=== Calibration related ===
||Channel Name ||Apr 28, 09:00- 2018 ||
||K1:GRD-PSL_STATE_N ||e ||

Important Channels for bKAGRA Phase 1

Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.

Important settings to remember

Channel Name

Apr 28, 09:00- 2018

K1:GRD-PSL_STATE_N

MICH lock status by GUARDIAN

Channel Name

Apr 28, 09:00- 2018

K1:LSC-MICH_IN1_DQ

error signal of MICH control

||K1:LS-MICH2_OUT_DQ || controls signal of MICH control ||

Channel Name

Apr 28, 09:00- 2018

K1:GRD-PSL_STATE_N

e

KAGRA/Commissioning/Phase1/Operation/ChannelList (last edited 2018-06-26 10:55:35 by TakaakiYokozawa)