Line 3: Line 3:
 * CALIBRATION Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.

== Important settings to remember ==

=== Commissioning related ===
||Channel Name ||Apr 28, 09:00- 2018 ||
||K1:GRD-PSL_STATE_N ||MICH lock status by GUARDIAN ||

=== LSC related ===
|| Channel Name || Apr 28, 09:00- 2018 ||
|| K1:LSC-MICH_IN1_DQ || error signal of MICH control ||
|| K1:LS-MICH2_OUT_DQ || controls signal of MICH control ||

=== Calibration related ===
||Channel Name ||Apr 28, 09:00- 2018 ||
||K1:GRD-PSL_STATE_N ||e ||

Important Channels for bKAGRA Phase 1

Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.

Important settings to remember

Channel Name

Apr 28, 09:00- 2018

K1:GRD-PSL_STATE_N

MICH lock status by GUARDIAN

Channel Name

Apr 28, 09:00- 2018

K1:LSC-MICH_IN1_DQ

error signal of MICH control

|| K1:LS-MICH2_OUT_DQ || controls signal of MICH control ||

Channel Name

Apr 28, 09:00- 2018

K1:GRD-PSL_STATE_N

e