Size: 308
Comment:
|
Size: 649
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
= Calibration related = | === Commissioning related === ||Channel Name ||Apr 28, 09:00- 2018 || ||K1:GRD-PSL_STATE_N ||MICH lock status by GUARDIAN || === LSC related === || Channel Name || Apr 28, 09:00- 2018 || || K1:LSC-MICH_IN1_DQ || error signal of MICH control || || K1:LS-MICH2_OUT_DQ || controls signal of MICH control || === Calibration related === |
Important Channels for bKAGRA Phase 1
Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.
Important settings to remember
Commissioning related
Channel Name |
Apr 28, 09:00- 2018 |
K1:GRD-PSL_STATE_N |
MICH lock status by GUARDIAN |
LSC related
Channel Name |
Apr 28, 09:00- 2018 |
K1:LSC-MICH_IN1_DQ |
error signal of MICH control |
|| K1:LS-MICH2_OUT_DQ || controls signal of MICH control ||
Calibration related
Channel Name |
Apr 28, 09:00- 2018 |
K1:GRD-PSL_STATE_N |
e |