Size: 444
Comment:
|
Size: 948
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
=== LSC related === || Channel Name || Apr 28, 09:00- 2018 || || K1:LSC-MICH_IN1_DQ || error signal of MICH control || || K1:LS-MICH2_OUT_DQ || controls signal of MICH control || || K1:LSC-REFLAIR_B_LF_DQ || DC signal of PD at REFLection port || |
|
Line 14: | Line 19: |
||K1:GRD-PSL_STATE_N ||e || | ||K1:CAL-CS_PROC_C00_STRAIN_DQ || h-of-t reconstruction 1/c v_err + A v_ctrl || ||K1:CAL-CS_PROC_ERR_STRAIN_DQ || h-of-t reconstruction from error signal || ||K1:CAL-CS_PROC_CTRL_STRAIN_DQ || h-of-t reconstruction from control signal || |
Important Channels for bKAGRA Phase 1
Here is a list of important channels for bKAGRA phase1 Test Run. Time is given in JST. Units are in counts if not specified.
Important settings to remember
Commissioning related
Channel Name |
Apr 28, 09:00- 2018 |
K1:GRD-PSL_STATE_N |
MICH lock status by GUARDIAN |
LSC related
Channel Name |
Apr 28, 09:00- 2018 |
K1:LSC-MICH_IN1_DQ |
error signal of MICH control |
K1:LS-MICH2_OUT_DQ |
controls signal of MICH control |
K1:LSC-REFLAIR_B_LF_DQ |
DC signal of PD at REFLection port |
Calibration related
Channel Name |
Apr 28, 09:00- 2018 |
K1:CAL-CS_PROC_C00_STRAIN_DQ |
h-of-t reconstruction 1/c v_err + A v_ctrl |
K1:CAL-CS_PROC_ERR_STRAIN_DQ |
h-of-t reconstruction from error signal |
K1:CAL-CS_PROC_CTRL_STRAIN_DQ |
h-of-t reconstruction from control signal |