Differences between revisions 10 and 15 (spanning 5 versions)
Revision 10 as of 2018-05-04 22:55:35
Size: 3317
Comment:
Revision 15 as of 2018-05-07 10:13:18
Size: 3860
Comment:
Deletions are marked like this. Additions are marked like this.
Line 24: Line 24:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4949
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4960
Line 51: Line 53:
  * duty factor
   * Total: 68.65%
   * 4/28: 81.66%
   * 4/29: 97.00%
   * 4/30: 90.36%
   * 5/01: 87.09%
   * 5/02: 86.88%
   * 5/03: 19.97%
   * 5/04: 33.58%
   * 5/05: 64.18%
   * 5/06: 55.36%
Line 60: Line 73:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4954
 * Earthquake in Hawaii 2018-05-04 22:32:55 (UTC)
  * difference between iKAGRA and Phase-1?
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4948
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4955

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • time delay, resolution ...
    • succeefully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper)

  • alignment drift during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)