Differences between revisions 11 and 18 (spanning 7 versions)
Revision 11 as of 2018-05-05 18:15:45
Size: 3365
Comment:
Revision 18 as of 2018-05-07 12:05:13
Size: 4045
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4487
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4489
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4527
Line 25: Line 28:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4960
Line 52: Line 56:
  * duty factor
   * Total: 68.65%
   * 4/28: 81.66%
   * 4/29: 97.00%
   * 4/30: 90.36%
   * 5/01: 87.09%
   * 5/02: 86.88%
   * 5/03: 19.97%
   * 5/04: 33.58%
   * 5/05: 64.18%
   * 5/06: 55.36%
Line 61: Line 76:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4954
 * Earthquake in Hawaii 2018-05-04 22:32:55 (UTC)
  * difference between iKAGRA and Phase-1?
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4948
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4955
Line 65: Line 85:
 * differential seismic noise measured by Michelson (3-km CMRR)  * differential seismic noise measured by Michelson (3-km CMRR), GIF-X (1.5-km CMRR), IMC (26.65-m CMRR)

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • time delay, resolution ...
    • succeefully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper)

  • alignment drift during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)