Differences between revisions 12 and 13
Revision 12 as of 2018-05-05 18:17:20
Size: 3512
Comment:
Revision 13 as of 2018-05-07 09:54:43
Size: 3560
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4960

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • time delay, resolution ...
    • succeefully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper)

  • alignment drift during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)