Differences between revisions 12 and 24 (spanning 12 versions)
Revision 12 as of 2018-05-05 18:17:20
Size: 3512
Comment:
Revision 24 as of 2018-05-07 15:14:16
Size: 4939
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
   * RFPD transimpedance measurement was done with RFPD with different S/N.
Line 14: Line 15:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4487
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4489
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4527
Line 15: Line 19:
  * BS IM and TM use high power coil drivers instead of low power.
  * ETMY MN, TM, and TM use high power coil drivers instead of low power.
  * ETMX MN and IM V1/2 use high power coil drivers instead of low power. From May 4 or 5, IM H1/2/3,V3 also uses high power.
Line 18: Line 25:
  * slit size ~10mm, at C chamber first, and then A chamber
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3848
Line 19: Line 28:
  * time delay, resolution ...
  * succeefully monitored the beam under cryo baffles/shields
  * Tcam update frequency ~1sec, resolution [Inoue]
  * Tcam resolution?

  * successfully monitored the beam under cryo baffles/shields
Line 25: Line 35:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4960
Line 29: Line 40:
 * cooling curve (details -> CRY paper)
 * alignment drift during the cool down
 * cooling curve (details -> CRY paper) [Hasegawa?]
  * Platform, MN, IM, TM, shields
 * alignment drift, height change during the cool down
  * height change [Inoue]
  * not much info for alignment drift. O(100)urad in yaw [Izumi]
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4176
Line 45: Line 60:
  * for BS [Fujii]
Line 47: Line 63:
 * actuation efficiency drift  * actuation efficiency drift [Yamamoto]
Line 52: Line 68:
  * duty factor
   * Total: 68.65%
   * 4/28: 81.66%
   * 4/29: 97.00%
   * 4/30: 90.36%
   * 5/01: 87.09%
   * 5/02: 86.88%
   * 5/03: 19.97%
   * 5/04: 33.58%
   * 5/05: 64.18%
   * 5/06: 55.36%
Line 63: Line 90:
  * difference between iKAGRA and Phase-1?
   * ETMY takes ~2-3 hours to damp enough for locking. ETMX takes ~1 hour.
Line 64: Line 93:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4955
Line 68: Line 98:
 * differential seismic noise measured by Michelson (3-km CMRR)  * differential seismic noise measured by Michelson (3-km CMRR), GIF-X (1.5-km CMRR), IMC (26.65-m CMRR)
  * CMRR measurement with 3-km Michelson would be difficult
  * IMC CMRR [Nakano]

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • Tcam update frequency ~1sec, resolution [Inoue]
    • Tcam resolution?
    • successfully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper) [Hasegawa?]

    • Platform, MN, IM, TM, shields
  • alignment drift, height change during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)