Differences between revisions 20 and 21
Revision 20 as of 2018-05-07 13:26:20
Size: 4108
Comment:
Revision 21 as of 2018-05-07 14:21:25
Size: 4156
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=3848

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

Installation accuracy

Cryogenics

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)