Line 5: Line 5:
 * input power  * Duration
  * officially (as Saito-san mentioned): Apr 28 9:00am to May 7 6:00am (GPS time: 1208908818-1209675618)
 * input power [Kokeyama, Nakano]
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4377
  * 0.93W at PSL output
  * IMC coupling ratio is (1.20-0.72) / (1.20 - 0.25) = 51 %
  * this means 0.93W * 0.51 / 10 / 2 / 2 / 10 = 1.2 mW at REFL, 0.6 mW at REFL RD PD
Line 18: Line 24:
 * suspension and coil driver configurations (difference between the final configuration)  * suspension and coil driver configurations (difference between the final configuration in [[KAGRA/Subgroups/VIS/ActuatorDesign|ActuatorDesign]])
Line 20: Line 26:
  * ETMY MN, TM, and TM use high power coil drivers instead of low power.
  * ETMX MN and IM V1/2 use high power coil drivers instead of low power. From May 4 or 5, IM H1/2/3,V3 also uses high power.
  * ETMY MN, IM and TM use high power coil drivers instead of low power.
  * ETMX MN and IM V1/2 use high power coil drivers instead of low power. From May 4 or 5, IM H1/2/3,V3 also uses high power. ETMX TM used the default low power (not cryopayload version).
Line 33: Line 39:
 * initial alignment
  * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7659
Line 79: Line 87:
  * Michelson was lockable if ETMX/Y angular fluctuation is less than a few urad. Earthquakes shook ETMY to O(100) urad.

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • Tcam update frequency ~1sec, resolution [Inoue]
    • Tcam resolution?
    • successfully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper) [Hasegawa?]

    • Platform, MN, IM, TM, shields
  • alignment drift, height change during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Data acquisition, data transfer

  • latency, speed, total amount

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)