Differences between revisions 32 and 33
Revision 32 as of 2018-05-09 23:25:18
Size: 5514
Comment:
Revision 33 as of 2018-05-09 23:50:37
Size: 5632
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:
 * suspension and coil driver configurations (difference between the final configuration)  * suspension and coil driver configurations (difference between the final configuration in [[KAGRA/Subgroups/VIS/ActuatorDesign|ActuatorDesign]])
Line 25: Line 25:
  * ETMY MN, TM, and TM use high power coil drivers instead of low power.
  * ETMX MN and IM V1/2 use high power coil drivers instead of low power. From May 4 or 5, IM H1/2/3,V3 also uses high power.
  * ETMY MN, IM and TM use high power coil drivers instead of low power.
  * ETMX MN and IM V1/2 use high power coil drivers instead of low power. From May 4 or 5, IM H1/2/3,V3 also uses high power. ETMX TM used the default low power (not cryopayload version).

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • Tcam update frequency ~1sec, resolution [Inoue]
    • Tcam resolution?
    • successfully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper) [Hasegawa?]

    • Platform, MN, IM, TM, shields
  • alignment drift, height change during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Data acquisition, data transfer

  • latency, speed, total amount

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)