Differences between revisions 35 and 36
Revision 35 as of 2018-05-10 09:57:50
Size: 5813
Comment:
Revision 36 as of 2018-05-10 10:00:05
Size: 5834
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
 * vacuum pressure  * vacuum pressure [info from Y. Saito]

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

  • Duration
    • officially (as Saito-san mentioned): Apr 28 9:00am to May 7 6:00am (GPS time: 1208908818-1209675618)
  • input power [Kokeyama, Nakano]
  • power at detection RF PD
  • modulation frequency, modulation depth
  • vacuum pressure [info from Y. Saito]
    • Xend 3e-4 Pa (room temp)
    • Xarm 7e-6 Pa
    • Xfront 5e-5 Pa (room temp)
    • Yend 2e-5 Pa (cryo)
    • Yarm ~1e-6 Pa? (no monitors)
    • Yfront 8e-5 Pa (temperature rising started on Apr 28)
    • IMC, BS < ~1e-4 Pa (no monitors)

  • suspension and coil driver configurations (difference between the final configuration in ActuatorDesign)

    • BS IM and TM use high power coil drivers instead of low power.
    • ETMY MN, IM and TM use high power coil drivers instead of low power.
    • ETMX MN and IM V1/2 use high power coil drivers instead of low power. From May 4 or 5, IM H1/2/3,V3 also uses high power. ETMX TM used the default low power (not cryopayload version).

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • Tcam update frequency ~1sec, resolution [Inoue]
    • Tcam resolution?
    • successfully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper) [Hasegawa?]

    • Platform, MN, IM, TM, shields
  • alignment drift, height change during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Data acquisition, data transfer

  • latency, speed, total amount

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)