Differences between revisions 4 and 16 (spanning 12 versions)
Revision 4 as of 2018-04-30 15:37:50
Size: 2255
Comment:
Revision 16 as of 2018-05-07 11:55:08
Size: 3908
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
  * signal chain (http://klog.icrr.u-tokyo.ac.jp/osl/?r=4920)
Line 13: Line 14:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4527
Line 19: Line 21:
  * succeefully monitored the beam under cryo baffles/shields
Line 22: Line 25:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4949
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4960
Line 27: Line 32:
 * alignment drift during the cool down
Line 29: Line 35:
 * length actuation efficiency measurements for BS, comparison with expectations (http://klog.icrr.u-tokyo.ac.jp/osl/?r=4811)  * length actuation efficiency measurements for BS, comparison with expectations
 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4811
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4909
Line 31: Line 39:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4898
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4899
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4919
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4925
 * seismic attenuation ratio measurements for ETMY and Y
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4927
Line 37: Line 51:
 * visibility and optical gain drift (http://klog.icrr.u-tokyo.ac.jp/osl/?r=4775)  * visibility and optical gain drift
 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4775
Line 39: Line 54:
 * Noise budget (http://klog.icrr.u-tokyo.ac.jp/osl/?r=4834)   * duty factor
   * Total: 68.65%
   * 4/28: 81.66%
   * 4/29: 97.00%
   * 4/30: 90.36%
   * 5/01: 87.09%
   * 5/02: 86.88%
   * 5/03: 19.97%
   * 5/04: 33.58%
   * 5/05: 64.18%
   * 5/06: 55.36%
 * Noise budget
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4834
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4910
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4944
Line 41: Line 70:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4891
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4933
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4871
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4940
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4954
 * Earthquake in Hawaii 2018-05-04 22:32:55 (UTC)
  * difference between iKAGRA and Phase-1?
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4948
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4955
Line 44: Line 82:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4942
Line 46: Line 85:

== Hardware injection test ==
 * CBC injection(2018/4/30 Night shift)
 * CW injection(2018/5/2 Night shift)
  * [[KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary/CWInjection|CW Injection]]

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • time delay, resolution ...
    • succeefully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper)

  • alignment drift during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)