Differences between revisions 6 and 12 (spanning 6 versions)
Revision 6 as of 2018-05-04 11:59:52
Size: 2807
Comment:
Revision 12 as of 2018-05-05 18:17:20
Size: 3512
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
  * signal chain (http://klog.icrr.u-tokyo.ac.jp/osl/?r=4920)
Line 23: Line 24:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4949
Line 47: Line 49:
 * visibility and optical gain drift (http://klog.icrr.u-tokyo.ac.jp/osl/?r=4775)  * visibility and optical gain drift
 * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4775
Line 52: Line 55:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4944
Line 54: Line 58:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4933
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4871
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4940
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4954
 * Earthquake in Hawaii 2018-05-04 22:32:55 (UTC)
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4948
Line 57: Line 67:
  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=4942
Line 59: Line 70:

== Hardware injection test ==
 * CBC injection(2018/4/30 Night shift)
 * CW injection(2018/5/2 Night shift)
  * [[KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary/CWInjection|CW Injection]]

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • time delay, resolution ...
    • succeefully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper)

  • alignment drift during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)