Differences between revisions 9 and 10
Revision 9 as of 2018-05-04 22:55:19
Size: 3313
Comment:
Revision 10 as of 2018-05-04 22:55:35
Size: 3317
Comment:
Deletions are marked like this. Additions are marked like this.
Line 70: Line 70:
[[KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary/CWInjection|CW Injection]]   * [[KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary/CWInjection|CW Injection]]

Summary of Phase 1 Measurements

  • Summary of Phase 1 measurements for bKAGRA Phase 1 paper.

Basic configurations

Michelson initial alignment

  • details of slit method
  • Tcam and baffle PD performance (details-> Tcam paper)

    • time delay, resolution ...
    • succeefully monitored the beam under cryo baffles/shields

Installation accuracy

Cryogenics

  • cooling curve (details -> CRY paper)

  • alignment drift during the cool down

Suspension characterization

Sensitivity and stability

Seismic noise, arm length drift

Hardware injection test

  • CBC injection(2018/4/30 Night shift)
  • CW injection(2018/5/2 Night shift)

KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary (last edited 2018-10-01 20:39:54 by YutaMichimura)