Differences between revisions 1 and 2
Revision 1 as of 2018-04-28 15:01:01
Size: 3129
Comment:
Revision 2 as of 2018-04-28 15:29:37
Size: 3721
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Describe KAGRA/Commissioning/Phase1/Operation/ShiftManual here.
TEST
Describe KAGRA/Commissioning/Phase1/Operation/ShiftManual here. TEST
Line 4: Line 3:
=== Control Room Overview ===
pic

=== How to know the status of the interferometer ===
 * Look at the monitor here. If "ON", it is in OPERATION mode. If "OFF", it is not; something is strange

screen shots

 * If "OFF", check this screen

screen shots

 1. Check the state of LSC_MICH. If it is in READY, ENGAGE_SERVO, ENGAGE_BOOST, MICH_LOCKED, CALIBRATION_INJECTION, or ACTUATORCAL_INJECTION, the interferometer is now on the way to be OPERATION state. It will be ready soon. If it will not enter OPERATION state in a few minute, something is wrong. Call interferometer experts.

screen shots

 2. Check the
Line 6: Line 22:
Line 14: Line 29:
Line 17: Line 33:
Line 20: Line 37:
Line 23: Line 41:
Line 26: Line 45:
Line 29: Line 49:
Line 32: Line 53:
 * terminology
Line 33: Line 55:
 * terminology
||<style="background-color: #F0F0FF;">Abbreviation / Acronym||<style="background-color: #F0F0FF;">Meaning / Explanation||
||BS ||Beam Splitter||
||CDS
|| ||
||DAQ ||Data Acquisition||
||DAS||
Data Analysis||
||DC
||Direct Current||
||DET/Detchar ||Detector Characterization||
||DGS ||Digital System||
||DMG ||Data Management||
||EPICS ||Experimental Physics and Industrial Control System||
||EX/ETMX ||X Arm End Test Mass||
||EY/ETMY ||Y Arm End Test Mass||
||FCL ||Facility||
||GAS ||Geometric Anti-Spring||
||GIF ||Geophysics Interferometer||
||Guardian||Automation system for interferometers||
||IFO ||Interferometer Optics||
||IMC
||Input Mode Cleaner||
||LSC   ||Length Sensing and Control, especially for MIF||
||MCi/e/o   ||Name of three mirrors of IMC; Input, End, and Output mirrors ||
||Medm  ||GUI for dealing with EPICS||
||MI
||Michealson Interferometer||
||MIF
||Main Interferometer||
||Op''''''Lev ||Optical Lever; measures angle of a mirror||
||OSEM ||Optical Sensor and Electro''''''Magnet||
||PMC ||Pre-Mode Cleaner||
||PR3 ||Type Bp’ SAS. works as the last steering mirror for MI||
||PSL ||Pre-Stabilized Laser||
||SAS
||Seismic Attenuation System||
||TM    ||Test Mass||
||VAC ||Vacuum||
||VIS ||Vibration Isolation System||
||<#F0F0FF>Abbreviation / Acronym ||<#F0F0FF>Meaning / Explanation ||
||BS ||Beam Splitter ||
||CDS
|| ||
||DAQ ||Data Acquisition ||
||DAS ||
Data Analysis ||
||DC
||Direct Current ||
||DET/Detchar ||Detector Characterization ||
||DGS ||Digital System ||
||DMG ||Data Management ||
||EPICS ||Experimental Physics and Industrial Control System ||
||EX/ETMX ||X Arm End Test Mass ||
||EY/ETMY ||Y Arm End Test Mass ||
||FCL ||Facility ||
||GAS ||Geometric Anti-Spring ||
||GIF ||Geophysics Interferometer ||
||Guardian ||Automation system for interferometers ||
||IFO ||Interferometer Optics ||
||IMC
||Input Mode Cleaner ||
||LSC ||Length Sensing and Control, especially for MIF ||
||MCi/e/o ||Name of three mirrors of IMC; Input, End, and Output mirrors ||
||Medm ||GUI for dealing with EPICS ||
||MI
||Michealson Interferometer ||
||MIF
||Main Interferometer ||
||OpLev ||Optical Lever; measures angle of a mirror ||
||OSEM ||Optical Sensor and ElectroMagnet ||
||PMC ||Pre-Mode Cleaner ||
||PR3 ||Type Bp’ SAS. works as the last steering mirror for MI ||
||PSL ||Pre-Stabilized Laser ||
||SAS
||Seismic Attenuation System ||
||TM ||Test Mass ||
||VAC ||Vacuum ||
||VIS ||Vibration Isolation System ||

Describe KAGRA/Commissioning/Phase1/Operation/ShiftManual here. TEST

Control Room Overview

pic

How to know the status of the interferometer

  • Look at the monitor here. If "ON", it is in OPERATION mode. If "OFF", it is not; something is strange

screen shots

  • If "OFF", check this screen

screen shots

  1. Check the state of LSC_MICH. If it is in READY, ENGAGE_SERVO, ENGAGE_BOOST, MICH_LOCKED, CALIBRATION_INJECTION, or ACTUATORCAL_INJECTION, the interferometer is now on the way to be OPERATION state. It will be ready soon. If it will not enter OPERATION state in a few minute, something is wrong. Call interferometer experts.

screen shots

  1. Check the

basic tasks

  • you have to take the logbook to report the incident during the observation shift (see IFO Operational Manual)

  • you have to check the check list to avoid mistake during the observation shift (Check List)

ここから先は観測シフトの仕事を簡単にまとめたものです。まだ暫定的なメモのような状態なので、適宜アップデートして下さい。ここは分かりやすさのために日本語で書きます。余裕のある方は英語版も作って下さい。

[General]

  • まずコントロールルームのPCのapplication→terminal→mk→sitemapが開かれる

[DGS]

  • sitemap→CDS→DAQが全部緑になっているかどうかを確認。緑じゃなければその項目のボタンを押し、statusが0×0になっているか確認。なっていなれけば宮川さんか苔山さんに連絡。

[MIF]

  • sitemap→guardian→MICH_LOCKとIMC_LOCKを確認。PSLは3月中は触らない。(IMCがロックしていればIMC_MCI_TRANS_OUTPUTは0.35くらい)

[VIS]

  • sitemap→VIS→PR3の画面右側のWATCHDOG、DACKILL IOPが緑かどうかを確認。

[DMG]

  • DMG Check-Sheetを2時間おきに書く。コントロールルーム隣のサーバールームのPCを見て、Check-SheetのIn case of normalを満たしているか確認。Is the log outputs normal?は、PC画面に赤か黄のメッセージが出てこなければOK。

[klog]

  • klogに干渉計の状況を簡単に報告。

useful information

  • terminology

Abbreviation / Acronym

Meaning / Explanation

BS

Beam Splitter

CDS

DAQ

Data Acquisition

DAS

Data Analysis

DC

Direct Current

DET/Detchar

Detector Characterization

DGS

Digital System

DMG

Data Management

EPICS

Experimental Physics and Industrial Control System

EX/ETMX

X Arm End Test Mass

EY/ETMY

Y Arm End Test Mass

FCL

Facility

GAS

Geometric Anti-Spring

GIF

Geophysics Interferometer

Guardian

Automation system for interferometers

IFO

Interferometer Optics

IMC

Input Mode Cleaner

LSC

Length Sensing and Control, especially for MIF

MCi/e/o

Name of three mirrors of IMC; Input, End, and Output mirrors

Medm

GUI for dealing with EPICS

MI

Michealson Interferometer

MIF

Main Interferometer

OpLev

Optical Lever; measures angle of a mirror

OSEM

Optical Sensor and ElectroMagnet

PMC

Pre-Mode Cleaner

PR3

Type Bp’ SAS. works as the last steering mirror for MI

PSL

Pre-Stabilized Laser

SAS

Seismic Attenuation System

TM

Test Mass

VAC

Vacuum

VIS

Vibration Isolation System

  • how to search JGW document

KAGRA/Commissioning/Phase1/Operation/ShiftManual (last edited 2018-04-28 19:04:13 by YutaroEnomoto)