Differences between revisions 1 and 48 (spanning 47 versions)
Revision 1 as of 2018-04-28 15:01:01
Size: 3129
Comment:
Revision 48 as of 2018-04-28 18:16:05
Size: 7233
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Describe KAGRA/Commissioning/Phase1/Operation/ShiftManual here.
TEST
 . <<TableOfContents(2)>>
Line 4: Line 3:
== Control Room Overview ==
pic

== How to use Guardian ==
=== Accessing to the guardian screen ===
 . In the sitemap, you can click on the link for the guardian overview screen.
 {{attachment:sitemap_guardian.png||height="172",width="430"}} <<BR>> It pops up the following screen, <<BR>> {{attachment:guardian_howto3.png||height="281",width="434"}}

=== Knowing the current state and requested state ===
 . {{attachment:guardian_howto4.png||height="281",width="434"}}

=== How to request a state ===
 . Click on the gray bar in the middle.<<BR>> {{attachment:guardian_howto.png||height="298",width="433"}} <<BR>> Then, choose the desired state.<<BR>> {{attachment:guardian_howto2.png||height="299",width="434"}}

== How to know the status of the interferometer ==
 . Look at one of the TV monitor in the control room. If "ON", it is in OPERATION mode.
 {{attachment:obs_state.png||height="233",width="465"}}
 <<BR>>If "OFF", check the guardian overview screen<<BR>>
 {{attachment:guardian_howto3.png||height="281",width="434"}}
 <<BR>>Check the state of LSC_MICH. First check if the request state of LSC_MICH is OPERATION. If it is not, request OPERATION.<<BR>>
 {{attachment:guardian_howto4.png||height="281",width="434"}}
 . If the state is ''READY, ENGAGE_SERVO, ENGAGE_BOOST, MICH_LOCKED, CALIBRATION_INJECTION'', or ''ACTUATORCAL_INJECTION'', the interferometer is now on the way to be OPERATION state. It will be ready soon.
 <<BR>> /!\ ''' If it does not enter OPERATION state in a few mins. Call the interferometer experts.'''<<BR>>

 Check the status of ''IMC_LOCK, VIS_BS, VIS_PR2, VIS_PR3''. (Note that ''VIS_PRM'' is not used for now, so just ignore it)
 <<BR>>For IMC_LOCK, every thing should be green and IMC should be back automatically. <<BR>>

 {{attachment:IMC_guardian.png||height="293",width="453"}}<<BR>>
 For example, this is how the IMC_LOCK guardian should normally look like.<<BR>>
 {{attachment:IMC_guardian_status.png||height="281",width="407"}}<<BR>>
 /!\ '''If it does not come back in ~ 10 mins, call interferometer/IOO experts.'''<<BR>>
 For VIS_PR2 and VIS_BS, the state should be ALIGNED. If inot, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog.
 <<BR>> For VIS_PR3, the state should be DAMPED.
 If it is not, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog.

== How to reset Watch Dogs ==
 0. Request LSC_MICH to be READY by Guardian.

 1. Open Sitemap (from Terminal, type "mk" and press return).

 2. Click VIS

 3. Click the suspension of which you want to reset Watch Dog

 {{attachment:VISALL.png||width="407"}}<<BR>>

 === PRs case ===
 4. Request SAFE by Guardian

 5. Open "DETAILS" at bottom right

 6. Click WATCHDOG

 {{attachment:PR.png||width="800"}}<<BR>>

 . If something is red, press here to reset.
 {{attachment:PRWD.png||width="400"}}<<BR>>

 7. Click DACKILL (picture above)

 . If it is not green, press reset.
 {{attachment:DACKILL.png||width="200"}}<<BR>>

 8. Click Coil Driver WD (picture above)

 . Check if everything is green. If there are red signs, push corresponding WD Pulse ON button and then OFF button

{{attachment:PR_CDWD.png||width="800"}}<<BR>>

 9. Request DAMPED. For PR2, ~ 10 seconds after the state becomes DAMPED, request ALIENED.

 10. ~ 10 seconds after the suspension gets in a nominal state, request LSC_MICH to be OPERATION.

=== BS case ===
4. Request SAFE by Guardian

5. Open "Payload" at bottom center

6. Click WATCHDOG here.

pic

 . If something is red, press here to reset.

7. Click DACKILL here.

pic pic

 . If it is not green, press reset.

8. Click this button

pic

 . Check if everything is green. If there are red signs, push corresponding WD Pulse ON button and then OFF button

pic

9. Request DAMPED. For PR2, ~ 10 seconds after the state becomes DAMPED, request ALIENED.

10. ~ 10 seconds after the suspension gets in a nominal state, request LSC_MICH to be OPERATION.
Line 6: Line 106:
Line 14: Line 113:
Line 17: Line 117:
Line 20: Line 121:
Line 23: Line 125:
Line 26: Line 129:
Line 29: Line 133:
Line 32: Line 137:
 * terminology
Line 33: Line 139:
 * terminology
||<style="background-color: #F0F0FF;">Abbreviation / Acronym||<style="background-color: #F0F0FF;">Meaning / Explanation||
||BS ||Beam Splitter||
||CDS
|| ||
||DAQ ||Data Acquisition||
||DAS||
Data Analysis||
||DC
||Direct Current||
||DET/Detchar ||Detector Characterization||
||DGS ||Digital System||
||DMG ||Data Management||
||EPICS ||Experimental Physics and Industrial Control System||
||EX/ETMX ||X Arm End Test Mass||
||EY/ETMY ||Y Arm End Test Mass||
||FCL ||Facility||
||GAS ||Geometric Anti-Spring||
||GIF ||Geophysics Interferometer||
||Guardian||Automation system for interferometers||
||IFO ||Interferometer Optics||
||IMC
||Input Mode Cleaner||
||LSC   ||Length Sensing and Control, especially for MIF||
||MCi/e/o   ||Name of three mirrors of IMC; Input, End, and Output mirrors ||
||Medm  ||GUI for dealing with EPICS||
||MI
||Michealson Interferometer||
||MIF
||Main Interferometer||
||Op''''''Lev ||Optical Lever; measures angle of a mirror||
||OSEM ||Optical Sensor and Electro''''''Magnet||
||PMC ||Pre-Mode Cleaner||
||PR3 ||Type Bp’ SAS. works as the last steering mirror for MI||
||PSL ||Pre-Stabilized Laser||
||SAS
||Seismic Attenuation System||
||TM    ||Test Mass||
||VAC ||Vacuum||
||VIS ||Vibration Isolation System||
||<#F0F0FF>Abbreviation / Acronym ||<#F0F0FF>Meaning / Explanation ||
||BS ||Beam Splitter ||
||CDS
|| ||
||DAQ ||Data Acquisition ||
||DAS ||
Data Analysis ||
||DC
||Direct Current ||
||DET/Detchar ||Detector Characterization ||
||DGS ||Digital System ||
||DMG ||Data Management ||
||EPICS ||Experimental Physics and Industrial Control System ||
||EX/ETMX ||X Arm End Test Mass ||
||EY/ETMY ||Y Arm End Test Mass ||
||FCL ||Facility ||
||GAS ||Geometric Anti-Spring ||
||GIF ||Geophysics Interferometer ||
||Guardian ||Automation system for interferometers ||
||IFO ||Interferometer Optics ||
||IMC
||Input Mode Cleaner ||
||LSC ||Length Sensing and Control, especially for MIF ||
||MCi/e/o ||Name of three mirrors of IMC; Input, End, and Output mirrors ||
||Medm ||GUI for dealing with EPICS ||
||MI
||Michealson Interferometer ||
||MIF
||Main Interferometer ||
||OpLev ||Optical Lever; measures angle of a mirror ||
||OSEM ||Optical Sensor and ElectroMagnet ||
||PMC ||Pre-Mode Cleaner ||
||PR3 ||Type Bp’ SAS. works as the last steering mirror for MI ||
||PSL ||Pre-Stabilized Laser ||
||SAS
||Seismic Attenuation System ||
||TM ||Test Mass ||
||VAC ||Vacuum ||
||VIS ||Vibration Isolation System ||

Control Room Overview

pic

How to use Guardian

Accessing to the guardian screen

Knowing the current state and requested state

How to request a state

How to know the status of the interferometer

How to reset Watch Dogs

  1. Request LSC_MICH to be READY by Guardian.
  2. Open Sitemap (from Terminal, type "mk" and press return).
  3. Click VIS
  4. Click the suspension of which you want to reset Watch Dog

    VISALL.png
    === PRs case ===

  5. Request SAFE by Guardian
  6. Open "DETAILS" at bottom right
  7. Click WATCHDOG

    PR.png

  8. If something is red, press here to reset.

    PRWD.png

  9. Click DACKILL (picture above)
  10. If it is not green, press reset.

    DACKILL.png

  11. Click Coil Driver WD (picture above)
  12. Check if everything is green. If there are red signs, push corresponding WD Pulse ON button and then OFF button

PR_CDWD.png

  1. Request DAMPED. For PR2, ~ 10 seconds after the state becomes DAMPED, request ALIENED.
  2. ~ 10 seconds after the suspension gets in a nominal state, request LSC_MICH to be OPERATION.

BS case

4. Request SAFE by Guardian

5. Open "Payload" at bottom center

6. Click WATCHDOG here.

pic

7. Click DACKILL here.

pic pic

8. Click this button

pic

pic

9. Request DAMPED. For PR2, ~ 10 seconds after the state becomes DAMPED, request ALIENED.

10. ~ 10 seconds after the suspension gets in a nominal state, request LSC_MICH to be OPERATION.

basic tasks

ここから先は観測シフトの仕事を簡単にまとめたものです。まだ暫定的なメモのような状態なので、適宜アップデートして下さい。ここは分かりやすさのために日本語で書きます。余裕のある方は英語版も作って下さい。

[General]

[DGS]

[MIF]

[VIS]

[DMG]

[klog]

useful information

Abbreviation / Acronym

Meaning / Explanation

BS

Beam Splitter

CDS

DAQ

Data Acquisition

DAS

Data Analysis

DC

Direct Current

DET/Detchar

Detector Characterization

DGS

Digital System

DMG

Data Management

EPICS

Experimental Physics and Industrial Control System

EX/ETMX

X Arm End Test Mass

EY/ETMY

Y Arm End Test Mass

FCL

Facility

GAS

Geometric Anti-Spring

GIF

Geophysics Interferometer

Guardian

Automation system for interferometers

IFO

Interferometer Optics

IMC

Input Mode Cleaner

LSC

Length Sensing and Control, especially for MIF

MCi/e/o

Name of three mirrors of IMC; Input, End, and Output mirrors

Medm

GUI for dealing with EPICS

MI

Michealson Interferometer

MIF

Main Interferometer

OpLev

Optical Lever; measures angle of a mirror

OSEM

Optical Sensor and ElectroMagnet

PMC

Pre-Mode Cleaner

PR3

Type Bp’ SAS. works as the last steering mirror for MI

PSL

Pre-Stabilized Laser

SAS

Seismic Attenuation System

TM

Test Mass

VAC

Vacuum

VIS

Vibration Isolation System

KAGRA/Commissioning/Phase1/Operation/ShiftManual (last edited 2018-04-28 19:04:13 by YutaroEnomoto)