Size: 3129
Comment:
|
Size: 4962
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Describe KAGRA/Commissioning/Phase1/Operation/ShiftManual here. TEST |
== Control Room Overview == pic == How to use Guardian == pics == How to know the status of the interferometer == * Look at the monitor here. If "ON", it is in OPERATION mode. If "OFF", it is not; something is strange screen shots * If "OFF", check this screen screen shots 1. Check the state of LSC_MICH. First check if the request state of LSC_MICH is OPERATION. If it is not, request OPERATION. Screen shot 2. If the state is READY, ENGAGE_SERVO, ENGAGE_BOOST, MICH_LOCKED, CALIBRATION_INJECTION, or ACTUATORCAL_INJECTION, the interferometer is now on the way to be OPERATION state. It will be ready soon. If it will not enter OPERATION state in a few mins, something is wrong. Call interferometer experts. . If it is in DOWN state, go to 3. 3. Check the status of IMC_LOCK, VIS_BS, VIS_PR2, VIS_PR3. (Note that VIS_PRM is not used for now, so just ignore it) -- For IMC_LOCK, every thing should be green and IMC should be back automatically. If it will not come back in ~ 10 mins, call interferomter/IOO experts. -- For VIS_PR2 and VIS_BS, the state should be ALIGNED. If it is not, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog. -- For VIS_PR3, the state should be DAMPED. If it is not, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog. == How to reset Watch Dogs == 1. Open Sitemap (from Terminal, type "mk" and press return). 2. Click VIS 3. Click the suspension of which you want to reset Watch Dog screenshot === PRs case === 4. Request SAFE by Guardian 5. Open DETAILS 6. Click WATCHDOG here. pic If something is red, press here to reset. 7. Click DACKILL here. pic pic If it is not green, press reset. 8. If eve |
Line 5: | Line 51: |
=== BS case === |
|
Line 6: | Line 54: |
Line 14: | Line 61: |
Line 17: | Line 65: |
Line 20: | Line 69: |
Line 23: | Line 73: |
Line 26: | Line 77: |
Line 29: | Line 81: |
Line 32: | Line 85: |
* terminology | |
Line 33: | Line 87: |
* terminology ||<style="background-color: #F0F0FF;">Abbreviation / Acronym||<style="background-color: #F0F0FF;">Meaning / Explanation|| ||BS ||Beam Splitter|| ||CDS || || ||DAQ ||Data Acquisition|| ||DAS|| Data Analysis|| ||DC ||Direct Current|| ||DET/Detchar ||Detector Characterization|| ||DGS ||Digital System|| ||DMG ||Data Management|| ||EPICS ||Experimental Physics and Industrial Control System|| ||EX/ETMX ||X Arm End Test Mass|| ||EY/ETMY ||Y Arm End Test Mass|| ||FCL ||Facility|| ||GAS ||Geometric Anti-Spring|| ||GIF ||Geophysics Interferometer|| ||Guardian||Automation system for interferometers|| ||IFO ||Interferometer Optics|| ||IMC ||Input Mode Cleaner|| ||LSC ||Length Sensing and Control, especially for MIF|| ||MCi/e/o ||Name of three mirrors of IMC; Input, End, and Output mirrors || ||Medm ||GUI for dealing with EPICS|| ||MI ||Michealson Interferometer|| ||MIF ||Main Interferometer|| ||Op''''''Lev ||Optical Lever; measures angle of a mirror|| ||OSEM ||Optical Sensor and Electro''''''Magnet|| ||PMC ||Pre-Mode Cleaner|| ||PR3 ||Type Bp’ SAS. works as the last steering mirror for MI|| ||PSL ||Pre-Stabilized Laser|| ||SAS ||Seismic Attenuation System|| ||TM ||Test Mass|| ||VAC ||Vacuum|| ||VIS ||Vibration Isolation System|| |
||<#F0F0FF>Abbreviation / Acronym ||<#F0F0FF>Meaning / Explanation || ||BS ||Beam Splitter || ||CDS || || ||DAQ ||Data Acquisition || ||DAS ||Data Analysis || ||DC ||Direct Current || ||DET/Detchar ||Detector Characterization || ||DGS ||Digital System || ||DMG ||Data Management || ||EPICS ||Experimental Physics and Industrial Control System || ||EX/ETMX ||X Arm End Test Mass || ||EY/ETMY ||Y Arm End Test Mass || ||FCL ||Facility || ||GAS ||Geometric Anti-Spring || ||GIF ||Geophysics Interferometer || ||Guardian ||Automation system for interferometers || ||IFO ||Interferometer Optics || ||IMC ||Input Mode Cleaner || ||LSC ||Length Sensing and Control, especially for MIF || ||MCi/e/o ||Name of three mirrors of IMC; Input, End, and Output mirrors || ||Medm ||GUI for dealing with EPICS || ||MI ||Michealson Interferometer || ||MIF ||Main Interferometer || ||OpLev ||Optical Lever; measures angle of a mirror || ||OSEM ||Optical Sensor and ElectroMagnet || ||PMC ||Pre-Mode Cleaner || ||PR3 ||Type Bp’ SAS. works as the last steering mirror for MI || ||PSL ||Pre-Stabilized Laser || ||SAS ||Seismic Attenuation System || ||TM ||Test Mass || ||VAC ||Vacuum || ||VIS ||Vibration Isolation System || |
Control Room Overview
pic
How to use Guardian
pics
How to know the status of the interferometer
- Look at the monitor here. If "ON", it is in OPERATION mode. If "OFF", it is not; something is strange
screen shots
- If "OFF", check this screen
screen shots
- Check the state of LSC_MICH. First check if the request state of LSC_MICH is OPERATION. If it is not, request OPERATION.
Screen shot
- If the state is READY, ENGAGE_SERVO, ENGAGE_BOOST, MICH_LOCKED, CALIBRATION_INJECTION, or ACTUATORCAL_INJECTION, the interferometer is now on the way to be OPERATION state. It will be ready soon. If it will not enter OPERATION state in a few mins, something is wrong. Call interferometer experts.
- If it is in DOWN state, go to 3.
- Check the status of IMC_LOCK, VIS_BS, VIS_PR2, VIS_PR3. (Note that VIS_PRM is not used for now, so just ignore it) -- For IMC_LOCK, every thing should be green and IMC should be back automatically. If it will not come back in ~ 10 mins, call interferomter/IOO experts. -- For VIS_PR2 and VIS_BS, the state should be ALIGNED. If it is not, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog. -- For VIS_PR3, the state should be DAMPED. If it is not, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog.
How to reset Watch Dogs
- Open Sitemap (from Terminal, type "mk" and press return).
- Click VIS
- Click the suspension of which you want to reset Watch Dog
screenshot
PRs case
- Request SAFE by Guardian
- Open DETAILS
- Click WATCHDOG here.
pic
- If something is red, press here to reset.
- Click DACKILL here.
pic pic
- If it is not green, press reset.
- If eve
BS case
basic tasks
you have to take the logbook to report the incident during the observation shift (see IFO Operational Manual)
you have to check the check list to avoid mistake during the observation shift (Check List)
ここから先は観測シフトの仕事を簡単にまとめたものです。まだ暫定的なメモのような状態なので、適宜アップデートして下さい。ここは分かりやすさのために日本語で書きます。余裕のある方は英語版も作って下さい。
[General]
- まずコントロールルームのPCのapplication→terminal→mk→sitemapが開かれる
[DGS]
- sitemap→CDS→DAQが全部緑になっているかどうかを確認。緑じゃなければその項目のボタンを押し、statusが0×0になっているか確認。なっていなれけば宮川さんか苔山さんに連絡。
[MIF]
- sitemap→guardian→MICH_LOCKとIMC_LOCKを確認。PSLは3月中は触らない。(IMCがロックしていればIMC_MCI_TRANS_OUTPUTは0.35くらい)
[VIS]
- sitemap→VIS→PR3の画面右側のWATCHDOG、DACKILL IOPが緑かどうかを確認。
[DMG]
- DMG Check-Sheetを2時間おきに書く。コントロールルーム隣のサーバールームのPCを見て、Check-SheetのIn case of normalを満たしているか確認。Is the log outputs normal?は、PC画面に赤か黄のメッセージが出てこなければOK。
[klog]
- klogに干渉計の状況を簡単に報告。
useful information
- terminology
Abbreviation / Acronym |
Meaning / Explanation |
BS |
Beam Splitter |
CDS |
|
DAQ |
Data Acquisition |
DAS |
Data Analysis |
DC |
Direct Current |
DET/Detchar |
Detector Characterization |
DGS |
Digital System |
DMG |
Data Management |
EPICS |
Experimental Physics and Industrial Control System |
EX/ETMX |
X Arm End Test Mass |
EY/ETMY |
Y Arm End Test Mass |
FCL |
Facility |
GAS |
Geometric Anti-Spring |
GIF |
Geophysics Interferometer |
Guardian |
Automation system for interferometers |
IFO |
Interferometer Optics |
IMC |
Input Mode Cleaner |
LSC |
Length Sensing and Control, especially for MIF |
MCi/e/o |
Name of three mirrors of IMC; Input, End, and Output mirrors |
Medm |
GUI for dealing with EPICS |
MI |
Michealson Interferometer |
MIF |
Main Interferometer |
Optical Lever; measures angle of a mirror |
|
OSEM |
Optical Sensor and ElectroMagnet |
PMC |
Pre-Mode Cleaner |
PR3 |
Type Bp’ SAS. works as the last steering mirror for MI |
PSL |
Pre-Stabilized Laser |
SAS |
Seismic Attenuation System |
TM |
Test Mass |
VAC |
Vacuum |
VIS |
Vibration Isolation System |
- how to search JGW document