Differences between revisions 34 and 47 (spanning 13 versions)
Revision 34 as of 2018-04-28 17:47:12
Size: 6779
Comment:
Revision 47 as of 2018-04-28 18:15:12
Size: 7230
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
 <<TableOfContents(2)>>  . <<TableOfContents(2)>>
Line 9: Line 9:
 {{attachment:sitemap_guardian.png||height="172",width="430"}}
<<BR>> It pops up the following screen, <<BR>> {{attachment:guardian_howto3.png||height="281",width="434"}}
 {{attachment:sitemap_guardian.png||height="172",width="430"}} <<BR>> It pops up the following screen, <<BR>> {{attachment:guardian_howto3.png||height="281",width="434"}}
Line 16: Line 15:
 . Click on the gray bar in the middle.<<BR>> {{attachment:guardian_howto.png||height="298",width="433"}}<<BR>>
Then, choose the desired state.<<BR>> {{attachment:guardian_howto2.png||height="299",width="434"}}
 . Click on the gray bar in the middle.<<BR>> {{attachment:guardian_howto.png||height="298",width="433"}} <<BR>> Then, choose the desired state.<<BR>> {{attachment:guardian_howto2.png||height="299",width="434"}}
Line 22: Line 20:
 <<BR>>If "OFF", check the guardian overview screen<<BR>>
 {{attachment:guardian_howto3.png||height="281",width="434"}}
 <<BR>>Check the state of LSC_MICH. First check if the request state of LSC_MICH is OPERATION. If it is not, request OPERATION.<<BR>>
 {{attachment:guardian_howto4.png||height="281",width="434"}}
 . If the state is ''READY, ENGAGE_SERVO, ENGAGE_BOOST, MICH_LOCKED, CALIBRATION_INJECTION'', or ''ACTUATORCAL_INJECTION'', the interferometer is now on the way to be OPERATION state. It will be ready soon.
 <<BR>> /!\ ''' If it does not enter OPERATION state in a few mins. Call the interferometer experts.'''<<BR>>
Line 23: Line 27:
 <<BR>>If "OFF", check the guardian overview screen<<BR>>  Check the status of ''IMC_LOCK, VIS_BS, VIS_PR2, VIS_PR3''. (Note that ''VIS_PRM'' is not used for now, so just ignore it)
 <<BR>>For IMC_LOCK, every thing should be green and IMC should be back automatically. <<BR>>
Line 25: Line 30:
 {{attachment:guardian_howto3.png||height="281",width="434"}}

 <<BR>>Check the state of LSC_MICH. First check if the request state of LSC_MICH is OPERATION. If it is not, request OPERATION.<<BR>>

 {{attachment:guardian_howto4.png||height="281",width="434"}}

 2. If the state is READY, ENGAGE_SERVO, ENGAGE_BOOST, MICH_LOCKED, CALIBRATION_INJECTION, or ACTUATORCAL_INJECTION, the interferometer is now on the way to be OPERATION state. It will be ready soon. If it will not enter OPERATION state in a few mins, something is wrong. Call interferometer experts.
  . If it is in DOWN state, go to 3.

 2. Check the status of IMC_LOCK, VIS_BS, VIS_PR2, VIS_PR3. (Note that VIS_PRM is not used for now, so just ignore it) -- For IMC_LOCK, every thing should be green and IMC should be back automatically. If it will not come back in ~ 10 mins, call interferomter/IOO experts. -- For VIS_PR2 and VIS_BS, the state should be ALIGNED. If it is not, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog. -- For VIS_PR3, the state should be DAMPED. If it is not, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog.
 {{attachment:IMC_guardian.png||height="293",width="453"}}<<BR>>
 For example, this is how the IMC_LOCK guardian should normally look like.<<BR>>
 {{attachment:IMC_guardian_status.png||height="281",width="407"}}<<BR>>
 /!\ '''If it does not come back in ~ 10 mins, call interferometer/IOO experts.'''<<BR>>
 For VIS_PR2 and VIS_BS, the state should be ALIGNED. If inot, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog.
 <<BR>> For VIS_PR3, the state should be DAMPED.
 If it is not, a notification "please reset Watch Dog!" will show up, and the state is in TRIPPED. In that case, go to the next section to know how to reset Watch Dog.
Line 37: Line 39:
0. Request LSC_MICH to be READY by Guardian.  0. Request LSC_MICH to be READY by Guardian.
Line 39: Line 41:
1. Open Sitemap (from Terminal, type "mk" and press return).  1. Open Sitemap (from Terminal, type "mk" and press return).
Line 41: Line 43:
2. Click VIS  2. Click VIS
Line 43: Line 45:
3. Click the suspension of which you want to reset Watch Dog  3. Click the suspension of which you want to reset Watch Dog
Line 45: Line 47:
screenshot  {{attachment:VISALL.png||width="407"}}<<BR>>
Line 48: Line 50:
4. Request SAFE by Guardian  4. Request SAFE by Guardian
Line 50: Line 52:
5. Open "DETAILS" at bottom right  5. Open "DETAILS" at bottom right
Line 52: Line 54:
6. Click WATCHDOG here.  6. Click WATCHDOG
Line 54: Line 56:
pic  {{attachment:PR.png||width="800"}}<<BR>>
Line 57: Line 59:
{{attachment:PRWD.png||width="400"}}<<BR>>
Line 58: Line 61:
7. Click DACKILL here.

pic pic
 7. Click DACKILL (picture above)
Line 63: Line 64:
{{attachment:DACKILL.png||width="200"}}<<BR>>
Line 64: Line 66:
8. Click this button

pic
 8. Click Coil Driver WD (picture above)
Line 70: Line 70:
pic {{attachment:PR_CDWD.png||width="800"}}<<BR>>
Line 72: Line 72:
9. Request DAMPED. For PR2, ~ 10 seconds after the state becomes DAMPED, request ALIENED.  9. Request DAMPED. For PR2, ~ 10 seconds after the state becomes DAMPED, request ALIENED.
Line 74: Line 74:
10. ~ 10 seconds after the suspension gets in a nominal state, request LSC_MICH to be OPERATION.  10. ~ 10 seconds after the suspension gets in a nominal state, request LSC_MICH to be OPERATION.

Control Room Overview

pic

How to use Guardian

Accessing to the guardian screen

Knowing the current state and requested state

How to request a state

How to know the status of the interferometer

How to reset Watch Dogs

  1. Request LSC_MICH to be READY by Guardian.
  2. Open Sitemap (from Terminal, type "mk" and press return).
  3. Click VIS
  4. Click the suspension of which you want to reset Watch Dog

    VISALL.png

PRs case

  1. Request SAFE by Guardian
  2. Open "DETAILS" at bottom right
  3. Click WATCHDOG

    PR.png

  4. If something is red, press here to reset.

PRWD.png

  1. Click DACKILL (picture above)
  2. If it is not green, press reset.

DACKILL.png

  1. Click Coil Driver WD (picture above)
  2. Check if everything is green. If there are red signs, push corresponding WD Pulse ON button and then OFF button

PR_CDWD.png

  1. Request DAMPED. For PR2, ~ 10 seconds after the state becomes DAMPED, request ALIENED.
  2. ~ 10 seconds after the suspension gets in a nominal state, request LSC_MICH to be OPERATION.

BS case

4. Request SAFE by Guardian

5. Open "Payload" at bottom center

6. Click WATCHDOG here.

pic

7. Click DACKILL here.

pic pic

8. Click this button

pic

pic

9. Request DAMPED. For PR2, ~ 10 seconds after the state becomes DAMPED, request ALIENED.

10. ~ 10 seconds after the suspension gets in a nominal state, request LSC_MICH to be OPERATION.

basic tasks

ここから先は観測シフトの仕事を簡単にまとめたものです。まだ暫定的なメモのような状態なので、適宜アップデートして下さい。ここは分かりやすさのために日本語で書きます。余裕のある方は英語版も作って下さい。

[General]

[DGS]

[MIF]

[VIS]

[DMG]

[klog]

useful information

Abbreviation / Acronym

Meaning / Explanation

BS

Beam Splitter

CDS

DAQ

Data Acquisition

DAS

Data Analysis

DC

Direct Current

DET/Detchar

Detector Characterization

DGS

Digital System

DMG

Data Management

EPICS

Experimental Physics and Industrial Control System

EX/ETMX

X Arm End Test Mass

EY/ETMY

Y Arm End Test Mass

FCL

Facility

GAS

Geometric Anti-Spring

GIF

Geophysics Interferometer

Guardian

Automation system for interferometers

IFO

Interferometer Optics

IMC

Input Mode Cleaner

LSC

Length Sensing and Control, especially for MIF

MCi/e/o

Name of three mirrors of IMC; Input, End, and Output mirrors

Medm

GUI for dealing with EPICS

MI

Michealson Interferometer

MIF

Main Interferometer

OpLev

Optical Lever; measures angle of a mirror

OSEM

Optical Sensor and ElectroMagnet

PMC

Pre-Mode Cleaner

PR3

Type Bp’ SAS. works as the last steering mirror for MI

PSL

Pre-Stabilized Laser

SAS

Seismic Attenuation System

TM

Test Mass

VAC

Vacuum

VIS

Vibration Isolation System

KAGRA/Commissioning/Phase1/Operation/ShiftManual (last edited 2018-04-28 19:04:13 by YutaroEnomoto)