Differences between revisions 1 and 10 (spanning 9 versions)
Revision 1 as of 2018-04-27 08:48:18
Size: 279
Comment:
Revision 10 as of 2018-04-28 15:00:04
Size: 989
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
=== Schedule ===
Line 7: Line 8:

----
=== Daily Shift ===

 * [[KAGRA/Commissioning/Phase1/Operation/ShiftManual|Shift manual]] (wil be prepared soon.)
 * '''Daily note is located on the table during the operation term. Please write down statements you noticed.'''
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8202|Shift note]]
 * If you have any trouble or emergency, please contact a person who is related to things you encountered. Contact person is listed on the white board in the control room.

----
=== Summary ===
 * [[KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary|Measurements Summary]]
 * [[KAGRA/Commissioning/Phase1/Operation/ChannelList|Channel List]]

bKAGRA phase1 operation

Schedule

  • Term: 2018/4/28 9:00AM start - 2018/5/7 9:00AM end
  • Schedule

KAGRA/Commissioning/Phase1/phase-1 test run person in charge.png


Daily Shift

  • Shift manual (wil be prepared soon.)

  • Daily note is located on the table during the operation term. Please write down statements you noticed.

  • If you have any trouble or emergency, please contact a person who is related to things you encountered. Contact person is listed on the white board in the control room.