|
Size: 541
Comment:
|
Size: 587
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 12: | Line 12: |
| * [[|Shift manual]] (wil be prepared soon.) |
bKAGRA phase1 operation
Schedule
- Term: 2018/4/28 9:00AM start - 2018/5/7 9:00AM end
Daily Shift
- [[|Shift manual]] (wil be prepared soon.)
Daily note is located on the table during the operation term. Please write down statements you noticed.
