== Check list for ETMY vacuum 20171204 ==== == Check list for ETMY vacuum 20171204 ==
Line 3: Line 3:
Each item should have following format;
Line 5: Line 6:
 Once the item has been checked, it will be like: Once the item has been checked, it will be like:
  * --(item)-- (2017/12/10, Somebody)
Line 7: Line 9:
 * --(item)-- (2017/12/10, Somebody) ----

=== Alignment ===
 * --(ETMXでの光確認)-- (2017/12/04, 和泉)
 * --(ETMYでの光確認)-- (2017/12/12, 和泉)
 * --(BS damping to 1 urad rms)-- (2017/12/14, 和泉、長野、川崎、正田)
  * With the assumption that the Koach is off.
 * --(Find return light from ETMY at the center)-- (2017/Dec/19, Tomaru, Ushiba, Sato, Takahashi R, Izumi,)
 * --(Initialize all the optical levers)--
   * --(IMMTs 1 and 2)--
   * --(PRs 2 and 3)--
   * --(BS)-- (2017/Dec/20, Barton and Izumi)
   * --(ETMY)-- (2017/Dec/19, Ushiba, Tomaru, Izumi)

=== Type-A tower (高橋) ===
 * --(BFのチューニング)--(11/28, 高橋)
 * --(F3のチューニング)--(11/30, 高橋・奥富)
 * --(TFのチューニング)--(12/7, 高橋)
 * --(BF damperの位置調整)--(12/7, 高橋)
 * --(IPのセンタリング)--(12/7, 高橋)
 * --(BF FRの動作確認)--(12/8, 高橋・奥富)
 * --(BF yaw picomotorの動作確認)--(高橋・佐藤)
 * --(トップ真空槽蓋閉め)--(12/21, 高橋・佐藤)
 * --(トップ真空槽ボルト閉め)--(12/22, 木村)
 * --(クロス菅ボルト閉め)--(12/22, 木村)->
 * --(IPのDC調整)-- (高橋)
 * BFのdamping制御 -> 1/13, 14日に調整、計算機のサポートは土曜:宮川、日曜:山本
 * --(BF FRによるmirrorの高さ調整)--(12/21, 高橋)
 * --(BF yaw picomotorによるmirrorのyaw調整)--(12/20, 高橋)
 * --(事前にTypeA、Cryopayloadのアラインメント機構が動くかどうか確認する。)--

=== 鏡板閉止 (木村) ===

 * --(鏡板取付前の変換フランジ取付)-- (2017/12/18, 木村)
 * --(輻射シールドのシャッター開確認)-- (2017/12/19, 木村)
 * 当該部のSI取り外し確認 (2018/XX/XX, 木村) -> 2018/1/18予定
 * --(鏡板取付後のビューポート取付)-- ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3909|2017/12/27]], 阿久津)
 * --(Oplev用の島?取付)-- ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=3910|2017/12/27]], 阿久津)

=== EYAチェンバー周り (井上) ===
 * --(フォトディテクターの取り外し)-- (2017/12/15, 横澤)
 * --(冷却と主ビーム観測に向けたTcamのセッティング)-- (2017/12/27, 井上, 横澤)
 * --(Gigeカメラの前の真空窓取り外しと取り付け)-- (2017/12/18, 井上)
  * (Gigeカメラのポートにはメタルガスケットが入っていないため、そのまま冷却をスタートしてしまうと真空漏れを起こしミラー表面を汚してしまう。)
 * EYAカメラ側鏡板閉止 (2018/XX/XX, 木村) -> 2018/1/18予定
Line 10: Line 56:
=== 鏡板閉止 === === 真空引き開始前後から冷却開始まで (木村) ===
Line 12: Line 58:
 * 鏡板取付前の変換フランジ取付 (2017/XX/XX, who)
 * 輻射シールドのシャッター開確認 (2017/XX/XX, who)
 * 当該部のSI取り外し確認 (2017/XX/XX, who)
 * 鏡板取付後のビューポート取付 (2017/XX/XX, who)
 * Oplev用の島?取付 (2017/XX/XX, who)
 1. 真空フランジを開放し、再度閉止した箇所の確認(リーク試験箇所の確定に必要な情報です。)
  * グループ毎の申告による
   * EYV chamber: VIS group (2017/XX/XX, 高橋)
   * EYAカメラ側鏡板閉止 (2018/XX/XX, 木村) -> 2018/1/18予定
   * EYV chamber: CRY group (2017/12/22, 木村+双葉工業)
   * クロス菅鏡板2箇所: CRY group (2017/12/22, 木村+双葉工業)
   * ICF253送風機接続ポート: CRY group (2018/**/**, 木村)
   * φ800サイドフランジ: CRY group (2018/**/**, 木村)

 * 温度・圧縮機のモニター
  * スタートさせる (2018/XX/XX, 都丸、麻生) -> 2018/1/11予定
  * 温度・圧縮機のループテスト (2018/XX/XX, 都丸、麻生) -> 2018/1/17予定

 * 真空引き
  i. 真空計2台 ON (2017/XX/XX, 木村) -> 2018/1/19朝予定
  * 粗挽きポンプスタート (2017/XX/XX, 木村) -> 2018/1/19朝予定
  * ターボポンプ冷却水循環装置スタート (2017/XX/XX, 木村) -> 2018/1/20予定
  * ターボポンプスタート (2017/XX/XX, 木村) -> 2018/1/20予定

 * リーク試験 (2017/XX/XX, 木村、上田、高橋(icrr)) -> 2018/1/24,25予定
  * (リーク判定 < 1x10^-10 Pa・m^3/s)

 * 冷却開始
  i. ヘリウム圧縮機用冷却水循環装置 1次冷却水バルブ 開 (2017/XX/XX, 木村)
  * ヘリウム圧縮機用冷却水循環装置 ON (2017/XX/XX, 木村)
  * ヘリウム圧縮機 6台 ON (2017/XX/XX, 木村)



=== Cryo payload (都丸、牛場) ===

 * リリース関係
  * --(PFのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(MNのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(MNRのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(IMのリリース(6箇所))--(2017/12/20, 牛場、都丸)
  * --(IMRのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(TMのリリース(16箇所))--(2017/12/20, 牛場、都丸)
  * --(TMRのリリース(15箇所))--(2017/12/20, 牛場、都丸)

 * センサーチェック
  * --(TM Op''''''Lev Pitch:キャリブレーション済み)--(2017/12/08,牛場、宮本)
  * --(TM Op''''''Lev Yaw:キャリブレーション済み)--(2017/12/08,牛場、宮本)
  * TM Op''''''Lev Length:未確認


  * --(IM PS H1:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS H2:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS H3:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS V1:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS V2:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(IM PS V3:動作確認済み)--(2017/12/21,牛場、宮本)

  * --(MN PS H1:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS H2:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS H3:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS V1:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS V2:動作確認済み)--(2017/12/21,牛場、宮本)
  * --(MN PS V3:動作確認済み)--(2017/12/21,牛場、宮本)

  * MN Op''''''Lev Pitch:未実装
  * MN Op''''''Lev Yaw:未実装

  * --(温度計A:接続確認済み)--(2017/12/21,牛場)
  * --(温度計C:接続確認済み)--(2017/12/21,牛場)
  * --(温度計D:接続確認済み)--(2017/12/21,牛場)
  * --(温度計E:接続確認済み)--(2017/12/21,牛場)
  * --(温度計F:接続確認済み)--(2017/12/21,牛場)
  * --(温度計G:出力不良、真空槽外配線が原因)--(2017/12/21,牛場、宮本)
  * --(温度計H:接続確認済み)--(2017/12/21,牛場)


 * アクチュエータチェック
  * --(TM アクチュエータ H1:動作確認済み)--(2017/12/11,牛場、宮本、長谷川、田中)
  * --(TM アクチュエータ H2:動作確認済み)--(2017/12/11,牛場、宮本、長谷川、田中)
  * --(TM アクチュエータ H3:動作確認済み)--(2017/12/11,牛場、宮本、長谷川、田中)
  * --(TM アクチュエータ H4:動作確認済み)--(2017/12/11,牛場、宮本、長谷川、田中)

  * --(IM アクチュエータ H1:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ H2:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ H3:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ V1:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ V2:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(IM アクチュエータ V3:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)

  * --(MN アクチュエータ H1:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ H2:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ H3:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ V1:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ V2:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)
  * --(MN アクチュエータ V3:動作確認済み)--(2017/12/15,牛場、宮本、長谷川)

  * --(SBS ダンピングコイル(V1-V4):接続確認済み)--(2017/12/??,牛場)

  * --(MN moving mass1:動作確認済み)--(2017/12/15,牛場、都丸)
  * --(MN moving mass2:動作確認済み)--(2017/12/15,牛場、都丸)
  * --(PF moving mass1:動作確認済み)--(2017/12/15,牛場、都丸)
  * --(PF moving mass2:動作確認済み)--(2017/12/15,牛場、都丸)

 * ダンピング制御
  * MN IM TMを用いたヒエラリカル制御 (TMのみなどではアクチュエータレンジ不足)

Check list for ETMY vacuum 20171204

Each item should have following format;

  • item (checked date, checked person)

Once the item has been checked, it will be like:

  • item (2017/12/10, Somebody)


Alignment

  • ETMXでの光確認 (2017/12/04, 和泉)

  • ETMYでの光確認 (2017/12/12, 和泉)

  • BS damping to 1 urad rms (2017/12/14, 和泉、長野、川崎、正田)

    • With the assumption that the Koach is off.
  • Find return light from ETMY at the center (2017/Dec/19, Tomaru, Ushiba, Sato, Takahashi R, Izumi,)

  • Initialize all the optical levers

    • IMMTs 1 and 2

    • PRs 2 and 3

    • BS (2017/Dec/20, Barton and Izumi)

    • ETMY (2017/Dec/19, Ushiba, Tomaru, Izumi)

Type-A tower (高橋)

  • BFのチューニング(11/28, 高橋)

  • F3のチューニング(11/30, 高橋・奥富)

  • TFのチューニング(12/7, 高橋)

  • BF damperの位置調整(12/7, 高橋)

  • IPのセンタリング(12/7, 高橋)

  • BF FRの動作確認(12/8, 高橋・奥富)

  • BF yaw picomotorの動作確認(高橋・佐藤)

  • トップ真空槽蓋閉め(12/21, 高橋・佐藤)

  • トップ真空槽ボルト閉め(12/22, 木村)

  • クロス菅ボルト閉め(12/22, 木村)->

  • IPのDC調整 (高橋)

  • BFのdamping制御 -> 1/13, 14日に調整、計算機のサポートは土曜:宮川、日曜:山本

  • BF FRによるmirrorの高さ調整(12/21, 高橋)

  • BF yaw picomotorによるmirrorのyaw調整(12/20, 高橋)

  • 事前にTypeA、Cryopayloadのアラインメント機構が動くかどうか確認する。

鏡板閉止 (木村)

  • 鏡板取付前の変換フランジ取付 (2017/12/18, 木村)

  • 輻射シールドのシャッター開確認 (2017/12/19, 木村)

  • 当該部のSI取り外し確認 (2018/XX/XX, 木村) -> 2018/1/18予定

  • 鏡板取付後のビューポート取付 (2017/12/27, 阿久津)

  • Oplev用の島?取付 (2017/12/27, 阿久津)

EYAチェンバー周り (井上)

  • フォトディテクターの取り外し (2017/12/15, 横澤)

  • 冷却と主ビーム観測に向けたTcamのセッティング (2017/12/27, 井上, 横澤)

  • Gigeカメラの前の真空窓取り外しと取り付け (2017/12/18, 井上)

    • (Gigeカメラのポートにはメタルガスケットが入っていないため、そのまま冷却をスタートしてしまうと真空漏れを起こしミラー表面を汚してしまう。)
  • EYAカメラ側鏡板閉止 (2018/XX/XX, 木村) -> 2018/1/18予定

真空引き開始前後から冷却開始まで (木村)

  1. 真空フランジを開放し、再度閉止した箇所の確認(リーク試験箇所の確定に必要な情報です。)
    • グループ毎の申告による
      • EYV chamber: VIS group (2017/XX/XX, 高橋)
      • EYAカメラ側鏡板閉止 (2018/XX/XX, 木村) -> 2018/1/18予定

      • EYV chamber: CRY group (2017/12/22, 木村+双葉工業)
      • クロス菅鏡板2箇所: CRY group (2017/12/22, 木村+双葉工業)
      • ICF253送風機接続ポート: CRY group (2018/**/**, 木村)
      • φ800サイドフランジ: CRY group (2018/**/**, 木村)
  2. 温度・圧縮機のモニター
    • スタートさせる (2018/XX/XX, 都丸、麻生) -> 2018/1/11予定

    • 温度・圧縮機のループテスト (2018/XX/XX, 都丸、麻生) -> 2018/1/17予定

  3. 真空引き
    1. 真空計2台 ON (2017/XX/XX, 木村) -> 2018/1/19朝予定

    2. 粗挽きポンプスタート (2017/XX/XX, 木村) -> 2018/1/19朝予定

    3. ターボポンプ冷却水循環装置スタート (2017/XX/XX, 木村) -> 2018/1/20予定

    4. ターボポンプスタート (2017/XX/XX, 木村) -> 2018/1/20予定

  4. リーク試験 (2017/XX/XX, 木村、上田、高橋(icrr)) -> 2018/1/24,25予定

    • (リーク判定 < 1x10-10 Pa・m3/s)

  5. 冷却開始
    1. ヘリウム圧縮機用冷却水循環装置 1次冷却水バルブ 開 (2017/XX/XX, 木村)
    2. ヘリウム圧縮機用冷却水循環装置 ON (2017/XX/XX, 木村)
    3. ヘリウム圧縮機 6台 ON (2017/XX/XX, 木村)

Cryo payload (都丸、牛場)

  • リリース関係
    • PFのリリース(16箇所)(2017/12/20, 牛場、都丸)

    • MNのリリース(16箇所)(2017/12/20, 牛場、都丸)

    • MNRのリリース(16箇所)(2017/12/20, 牛場、都丸)

    • IMのリリース(6箇所)(2017/12/20, 牛場、都丸)

    • IMRのリリース(16箇所)(2017/12/20, 牛場、都丸)

    • TMのリリース(16箇所)(2017/12/20, 牛場、都丸)

    • TMRのリリース(15箇所)(2017/12/20, 牛場、都丸)

  • センサーチェック
    • TM OpLev Pitch:キャリブレーション済み(2017/12/08,牛場、宮本)

    • TM OpLev Yaw:キャリブレーション済み(2017/12/08,牛場、宮本)

    • TM OpLev Length:未確認

    • IM PS H1:動作確認済み(2017/12/21,牛場、宮本)

    • IM PS H2:動作確認済み(2017/12/21,牛場、宮本)

    • IM PS H3:動作確認済み(2017/12/21,牛場、宮本)

    • IM PS V1:動作確認済み(2017/12/21,牛場、宮本)

    • IM PS V2:動作確認済み(2017/12/21,牛場、宮本)

    • IM PS V3:動作確認済み(2017/12/21,牛場、宮本)

    • MN PS H1:動作確認済み(2017/12/21,牛場、宮本)

    • MN PS H2:動作確認済み(2017/12/21,牛場、宮本)

    • MN PS H3:動作確認済み(2017/12/21,牛場、宮本)

    • MN PS V1:動作確認済み(2017/12/21,牛場、宮本)

    • MN PS V2:動作確認済み(2017/12/21,牛場、宮本)

    • MN PS V3:動作確認済み(2017/12/21,牛場、宮本)

    • MN OpLev Pitch:未実装

    • MN OpLev Yaw:未実装

    • 温度計A:接続確認済み(2017/12/21,牛場)

    • 温度計C:接続確認済み(2017/12/21,牛場)

    • 温度計D:接続確認済み(2017/12/21,牛場)

    • 温度計E:接続確認済み(2017/12/21,牛場)

    • 温度計F:接続確認済み(2017/12/21,牛場)

    • 温度計G:出力不良、真空槽外配線が原因(2017/12/21,牛場、宮本)

    • 温度計H:接続確認済み(2017/12/21,牛場)

  • アクチュエータチェック
    • TM アクチュエータ H1:動作確認済み(2017/12/11,牛場、宮本、長谷川、田中)

    • TM アクチュエータ H2:動作確認済み(2017/12/11,牛場、宮本、長谷川、田中)

    • TM アクチュエータ H3:動作確認済み(2017/12/11,牛場、宮本、長谷川、田中)

    • TM アクチュエータ H4:動作確認済み(2017/12/11,牛場、宮本、長谷川、田中)

    • IM アクチュエータ H1:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • IM アクチュエータ H2:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • IM アクチュエータ H3:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • IM アクチュエータ V1:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • IM アクチュエータ V2:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • IM アクチュエータ V3:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • MN アクチュエータ H1:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • MN アクチュエータ H2:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • MN アクチュエータ H3:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • MN アクチュエータ V1:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • MN アクチュエータ V2:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • MN アクチュエータ V3:動作確認済み(2017/12/15,牛場、宮本、長谷川)

    • SBS ダンピングコイル(V1-V4):接続確認済み(2017/12/??,牛場)

    • MN moving mass1:動作確認済み(2017/12/15,牛場、都丸)

    • MN moving mass2:動作確認済み(2017/12/15,牛場、都丸)

    • PF moving mass1:動作確認済み(2017/12/15,牛場、都丸)

    • PF moving mass2:動作確認済み(2017/12/15,牛場、都丸)

  • ダンピング制御
    • MN IM TMを用いたヒエラリカル制御 (TMのみなどではアクチュエータレンジ不足)

KAGRA/Commissioning/Phase1/Task/CheckList/20171204VacuumETMY (last edited 2018-01-30 09:32:18 by OsamuMiyakawa)