6580
Comment:
|
7200
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
* 2018/3/12-17: ducts connection * 2018/3/12-16: pump down and leak check |
* 2018/3/12-14: ducts connection * 2018/3/15-16: pump down * 2018/3/19-23: leak check |
Line 26: | Line 27: |
* PD movement from BS are to REFL are (2018/3/XX, Enomoto) -> Planned at 2018/3/XX | * --(PD movement from BS are to REFL area)-- (2018/3/7, Enomoto) |
Line 30: | Line 31: |
* Oplev monitor check for PRM (2018/3/XX Enomoto) -> Planned at 2018/3/XX * Oplev monitor check for PR2 (2018/3/XX Enomoto) -> Planned at 2018/3/XX * Oplev monitor check for PR3 (2018/3/XX Enomoto) -> Planned at 2018/3/XX * Oplev monitor check for BS (2018/3/XX Enomoto) -> Planned at 2018/3/XX * PD fot REFL (2018/3/XX Kokeyama) -> Planned at 2018/3/XX |
* Oplev monitor check for PRM (2018/3/XX Kokeyama) -> 2018/3/14 planed by Kokeyama * --(Oplev monitor check for PR2)-- (2018/3/14 Enomoto) * --(Oplev monitor check for PR3)-- (2018/3/14 Enomoto) * Oplev monitor check for BS (2018/3/14 Enomoto) -> 2018/3/14 planed * --(PD for REFL)-- (2018/3/14 Enomoto) |
Line 38: | Line 39: |
* GigE camera for PR2 (2018/3/XX Kokeyama) -> Planned at 2018/3/XX * --(GigE camera for PR3)-- (2018/3/8 Kokeyama) * Tcam for ITMX (2018/3/XX Inoue) -> Planned at 2018/3/XX |
* --(GigE camera for PR2)-- (2018/3/7 Kokeyama) * --(GigE camera for PR3)-- (2018/3/7 Kokeyama) * --(GigE camera for BS)-- (2018/3/7 Kokeyama) * --(GigE camera for REFL)-- (2018/3/ Kokeyama) * --(Tcam for IXC)-- (2018/3/14 Yokozawa) * --(Tcam for IYC)-- (2018/3/14 Yokozawa) |
Line 43: | Line 47: |
* 真空槽の傾きをdial gaugeで測る (2018/3/XX Tomaru, Suzuki, Kimura) -> Planned at 2018/3/XX | * 真空槽の傾きをdial gaugeで測る。 (2018/3/XX Tomaru, Suzuki, Kimura) -> Planned at 2018/3/XX |
Line 112: | Line 116: |
* 至急:IFI, IMMの真空容器の状況 * IFF の、プラスY側のφ400のフランジ。Oringの有無は不明。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX * IMMの、マイナスY側のφ400のフランジ。Oringの有無は不明。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX |
* IFI, IMMの真空容器の状況 * IFF の、プラスY側のφ400のフランジ。Oringはついてないのでつける必要がある。 (2018/3/XX Kimura) -> Planned at 2018/3/XX * IMMの、マイナスY側のφ400のフランジ。Oringはついてないのでつける必要がある。 (2018/3/XX Kimura) -> Planned at 2018/3/XX |
Line 118: | Line 122: |
* トップフランジ: O-ringを入れてあるが,養生テープが貼ったまま。締められていない。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX * 上部サービスフランジ2枚(添付写真): 蓋は付いているが,締めていない。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX * フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX * フィードスルーフランジを取り付けるポートに付いているメクラフランジ: ちゃんと締めていない。ガスケットも入っていないかもしれない。 (2018/XX/XX Uchiyama) |
* トップフランジ: O-ringを入れてあるが,養生テープが貼ったまま。締められていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX * 上部サービスフランジ2枚(添付写真): 蓋は付いているが,締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX * フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX * フィードスルーフランジを取り付けるポートに付いているメクラフランジ: ちゃんと締めていない。ガスケットも入っていないかもしれない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX |
Line 123: | Line 127: |
* トップフランジ: O-ringが入っていない。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/7 * フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX |
* --(トップフランジ: O-ringが入っていない。)-- (2018/3/7 Kimura) * --(フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。)-- (2018/3/7 Kimura) * 各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX |
Line 126: | Line 131: |
* PR2: * --(トップフランジ: O-ringは入っているが締めていない。)-- (2018/3/5 Uchiyama) -> Planned at 2018/3/XX * フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX * グリーン入射用ビューポートのフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX |
* PR2: * --(トップフランジ: O-ringは入っているが締めていない。)-- (2018/3/5締めた Uchiyama) -> Planned at 2018/3/XX * フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX * グリーン入射用ビューポートのフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX * --(PR2側面フランジのユーティリティ用フランジ(ICF203、空気導入口として使用)の交換 1箇所の締め付け)-- (2018/3/7 Kimura) * 各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX |
Line 131: | Line 138: |
* PR3: * --(トップフランジ: O-ringは入っているが締めていない。)--(2018/3/5 Uchiyama) -> Planned at 2018/3/XX * フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX |
* PR3: * --(トップフランジ: O-ringは入っているが締めていない。)--(2018/3/5締めた Uchiyama) -> Planned at 2018/3/XX * フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX * 各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX |
Check list for vacuum test in the Center area
- Term: 2018/3/7~2018/3/23
Schedule
- 2018/3/12-14: ducts connection
- 2018/3/15-16: pump down
- 2018/3/19-23: leak check
Check items
Each item should have following format;
item (checking date, checking person) -> Planned at 2018/3/XX
Once the item has been checked, it will be like:
item (2018/3/10, Somebody)
Alignment
Beam check at ETMX (2018/3/5, Enomoto)
Beam check at ETMY (2018/3/6, Enomoto)
Beam check at REFL (2018/3/6, Enomoto)
PD movement from BS are to REFL area (2018/3/7, Enomoto)
Preparation of monitors during pump down
Oplev monitor check for PRM (2018/3/XX Kokeyama) -> 2018/3/14 planed by Kokeyama
Oplev monitor check for PR2 (2018/3/14 Enomoto)
Oplev monitor check for PR3 (2018/3/14 Enomoto)
Oplev monitor check for BS (2018/3/14 Enomoto) -> 2018/3/14 planed
PD for REFL (2018/3/14 Enomoto)
GigE camera for IMMT1 (2018/3/7 Kokeyama)
GigE camera for IMMT2 (2018/3/7 Kokeyama)
GigE camera for PR2 (2018/3/7 Kokeyama)
GigE camera for PR3 (2018/3/7 Kokeyama)
GigE camera for BS (2018/3/7 Kokeyama)
GigE camera for REFL (2018/3/ Kokeyama)
Tcam for IXC (2018/3/14 Yokozawa)
Tcam for IYC (2018/3/14 Yokozawa)
Vacuum gage (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX
真空槽の傾きをdial gaugeで測る。 (2018/3/XX Tomaru, Suzuki, Kimura) -> Planned at 2018/3/XX
Other checks before pump down
Re-checkin beam before pump down (2018/XX/XX Enomoto) -> Planned at 2018/3/XX
Monitor for gate valve open/close (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
Star pump down(2018/XX/XX Uchiyama) -> Planned at 2018/3/19
Pump down (Kimura)
- 真空計 ON (2018/3/XX, Kimura)
粗挽きポンプスタート (2018/3/XX, Kimura) -> Planned at 2018/3/XX
大まかなリークチェック (2018/3/XX, Kimura) -> Planned at 2018/3/XX
ターボポンプ冷却水循環装置スタート (2018/3/XX, Kimura) -> Planned at 2018/3/XX
ターボポンプスタート (2018/3/XX, Kimura) -> Planned at 2018/3/XX
リーク試験 (2018/3/XX, Kimura) -> Planned at 2018/3/XX
(リーク判定 < 1x10-10 Pa・m3/s)
Checks during pump down
Vacuum monitor (2018/XX/XX Uchiyama) -> Planned at 2018/3/XX
真空引き後、防振系の動作チェック (2018/XX/XX Takahashi) -> Planned at 2018/3/XX
Connection status (Uchiyama)
GVmc
hemisphere(VM7950)φ 1000/400 L 570 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
IFI
pump port (VL7862C) φ 800 L 1285 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
IMM
bellows (VL7952A) φ 400 L 555 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
PRM
bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
pump port (VL8423) φ 800 L 760 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
PR3
bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
pump port (VL8428) φ 800 L 8225 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
PR2
bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
pump port (VL8425) φ 800 L 1740 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
bellows (VL7856) φ 800 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
BS
bellows (VL7855) φ 1000 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
pump port (VL8419) φ 1000 L 4376 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
bellows (VL7857D) φ 1000 L 620 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
GVbsx
BS
bellows/tube (VL7860) φ 1000 L 1765 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
pump port (VL7861) φ 1000 L 1400 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
GVbsy
BS
blank φ 800 (2018/3/XX Uchiyama) -> Planned at 2018/3/XX
以下、VIS,IOOに他に閉めるべきフランジがないかどうか確認してもらって作ったリスト
- IFI, IMMの真空容器の状況
IFF の、プラスY側のφ400のフランジ。Oringはついてないのでつける必要がある。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
IMMの、マイナスY側のφ400のフランジ。Oringはついてないのでつける必要がある。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
- VIS関連チャンバーの状況
- BS:
トップフランジ: O-ringを入れてあるが,養生テープが貼ったまま。締められていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
上部サービスフランジ2枚(添付写真): 蓋は付いているが,締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
フィードスルーフランジを取り付けるポートに付いているメクラフランジ: ちゃんと締めていない。ガスケットも入っていないかもしれない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
- PRM:
トップフランジ: O-ringが入っていない。 (2018/3/7 Kimura)
フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/7 Kimura)
各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
- PR2:
トップフランジ: O-ringは入っているが締めていない。 (2018/3/5締めた Uchiyama) -> Planned at 2018/3/XX
フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
グリーン入射用ビューポートのフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
PR2側面フランジのユーティリティ用フランジ(ICF203、空気導入口として使用)の交換 1箇所の締め付け (2018/3/7 Kimura)
各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
- PR3:
トップフランジ: O-ringは入っているが締めていない。(2018/3/5締めた Uchiyama) -> Planned at 2018/3/XX
フィードスルーフランジ: ガスケットは入れてあるが,ちゃんと締めていない。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
各側面フランジをクロークランプにより締め付ける。 (2018/3/XX Kimura) -> Planned at 2018/3/XX
- BS: