Line 12: Line 12:
  * Oplev
  * Actuator
  * EYCのTypeAとPayload接続完了
 * Oplev
 * Actuator
 * EYCのTypeAとPayload接続完了
 * 人員手配

Stage 1

  • Alignment up to BS

Stage 2

Tasks

  • Align ETMy to IFI (MIF, DGS, VIS, CRY, IOO) with damping
  • Lead MI-REFL beam outside the chamber (MIF, IOO)
  • Install and align MI-REFL output optics using the beam reflected by ETMy (MIF)

Preparation

  • Oplev
  • Actuator
  • EYCのTypeAとPayload接続完了
  • 人員手配

Stage 3

Tasks

  • Alignment of ETMx
  • Locking of MI with Cryogenic ETMy with Calibrated sensitivity curve

Stage 4

  • Locking of MI in vacuum with cryogenic ETMx/y with data stored