Differences between revisions 5 and 6
Revision 5 as of 2017-11-14 10:48:03
Size: 806
Comment:
Revision 6 as of 2017-11-14 10:48:56
Size: 850
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
----
Line 25: Line 26:
----
Line 30: Line 32:
----
Line 32: Line 35:

----
=== Test run ===

Stage 1

  • Alignment up to BS


Stage 2

  • Align ETMy to IFI (MIF, DGS, VIS, CRY, IOO) with damping
  • Lead MI-REFL beam outside the chamber (MIF, IOO)
  • Install and align MI-REFL output optics using the beam reflected by ETMy (MIF)

Preparation

  • Oplev
  • Actuator
  • 作業工程の確認 -> MIF

  • 人員手配 -> MIF

Tasks

  • EYCのTypeAとPayload接続完了
  • ETMYでの光確認
  • ETMYのアクチューエターの確認
  • ETMYのdampingの確認
  • ETMYからの光をセンターエリアで確認
  • REFLまでの引きこみ


Stage 3

Tasks

  • Alignment of ETMx
  • Locking of MI with Cryogenic ETMy with Calibrated sensitivity curve


Stage 4

  • Locking of MI in vacuum with cryogenic ETMx/y with data stored


Test run

KAGRA/Commissioning/Phase1/Task (last edited 2018-05-24 11:21:22 by OsamuMiyakawa)