=== Alignment === * Beam check at ETMX just before pump down(not possible with baffle PD through gate valve?) (2018/4/11 Enomoto) * Beam check at ETMY just before pump down (2018/4/13, Enomoto) * Beam check at REFL just before pump down (2018/4/13, Enomoto) |
|
Line 30: | Line 23: |
* --(Oplev monitor check for PRM)-- (2018/4/11 Enomoto) * --(Oplev monitor check for PR2)-- (2018/4/11 Enomoto) * --(Oplev monitor check for PR3)-- (2018/4/11 Enomoto) * --(Oplev monitor check for BS)-- (2018/4/11 Enomoto) * --(PD fot REFL)-- (2018/4/11 Enomoto) |
* Tcam for ITMX (2018/8/?? Inoue) -> (2018/8/XX planed) * Vacuum gage for IXA (2018/4/XX Inoue) -> (2018/8/XX planed) |
Line 36: | Line 26: |
* --(GigE camera for IMMT1)-- (2018/4/13 Enomoto) * --(GigE camera for IMMT2)-- (2018/4/13 Enomoto) * --(GigE camera for PR2)-- (2018/4/13 Enomoto) * --(GigE camera for PR3)-- (2018/4/13 Enomoto) * --(GigE camera for BS)-- (2018/4/13 Enomoto) * --(GigE camera for REFL)-- (2018/4/13 Enomoto) * --(Tcam for ETMX)-- (2018/4/11 Inoue) * --(Tcam for ETMY)-- (2018/4/11 Inoue) * --(Tcam for ITMX)-- (2018/4/5 Inoue) * --(Tcam for ITMY)-- (2018/4/5 Inoue) * --(Illuminator for ETMX)-- (2018/4/5 Yokozawa) * --(Illuminator for ETMY)-- (2018/4/5 Inoue) * Vacuum gage for X end (2018/4/XX Inoue) -> Planned at 2018/4/17,18 * Vacuum gage for X arm (2018/4/XX Inoue) -> Planned at 2018/4/17,18 * Vacuum gage for Y arm (2018/4/XX Inoue) -> Planned at 2018/4/17,18 * Vacuum gage for IXA (2018/4/XX Inoue) -> Planned at 2018/4/17,18 * Vacuum gage for IYA (2018/4/XX Inoue) -> Planned at 2018/4/17,18 * Vacuum gage for PRM-PR2 (2018/4/XX Inoue) -> Planned at 2018/4/17,18 * 真空槽の傾きをdial gaugeで測る。 (2018/4/XX Tomaru, Suzuki, Kimura) -> Planned at 2018/4/13 * Xend 機器制御 for status monitors (2018/4/XX Tomaru, Suzuki, Kimura) -> Planned at 2018/4/13 * --(Vacuum gauge monitor at the control room at least one location)-- (2018/4/12 Uchiyama, Kimura, Inoue, Miyoki) |
* 真空槽の傾きをdial gaugeで測る。 (2018/8/XX Tomaru, Suzuki, Kimura) -> (2018/8/XX planed) * ITMX 機器制御 for status monitors (2018/8/XX Tomaru, Suzuki, Kimura) -> (2018/8/XX planed) * Vacuum gauge monitor at the control room (2018/8/XX Uchiyama, Kimura, Inoue, Miyoki) -> (2018/8/XX planed) |
Line 64: | Line 33: |
* --(Cryo payload EQ stopの隙間のチェック5mm程度)-- (2018/4/12, Tomaru) * 真空引き後、防振系の動作チェック (2018/X/XX, Enomoto) -> (2018/4/13 planed) * EXA ゲードバルブの動作チェック (2018/X/XX, Uchiyama) -> (2018/4/20 planed) * EXA ゲードバルブの開閉モニター to 機器制御 (今回は必須でないかもしれない) (2018/X/XX, Uchiyama) -> (2018/4/20 planed) * --(ダストウィットネスサンプル設置)-- (2018/4/11, Hirose) |
* Cryo payload EQ stopの隙間のチェック5mm程度 (2018/X/XX, Tomaru) * 真空引き後、防振系の動作チェック (2018/X/XX, Enomoto) -> (2018/8/XX planed) * IXA ゲードバルブの動作チェック (2018/X/XX, Uchiyama) -> (2018/8/XX planed) |
Line 149: | Line 116: |
* --(PFのリリース(16箇所))-- (2018/4/12, Tomaru) * --(MNのリリース(16箇所))-- (2018/4/12, Tomaru) * --(MNRのリリース(16箇所))-- (2018/4/12, Tomaru) * --(IMのリリース(6箇所))-- (2018/4/12, Tomaru) * --(IMRのリリース(16箇所))-- (2018/4/12, Tomaru) * --(TMのリリース(16箇所))-- (2018/4/12, Tomaru) * --(TMRのリリース(15箇所))-- (2018/4/12, Tomaru) |
* PFのリリース(16箇所) (2018/X/XX, Tomaru) -> (2018/X/XX planed) * MNのリリース(16箇所) (2018/X/XX, Tomaru) * MNRのリリース(16箇所) (2018/X/XX, Tomaru) * IMのリリース(6箇所) (2018/X/XX, Tomaru) * IMRのリリース(16箇所) (2018/X/XX, Tomaru) * TMのリリース(16箇所) (2018/X/XX, Tomaru) * TMRのリリース(15箇所) (2018/X/XX, Tomaru) |
Line 158: | Line 125: |
* --(TM Op''''''Lev Pitch)-- (2018/3/30, Ushiba, Tomaru) * --(TM Op''''''Lev Yaw)-- (2018/3/30, Ushiba, Tomaru) * TM Op''''''Lev Length (2018/X/XX, Ushiba, Tomaru) -> (2018/4/16 planed) |
* TM Op''''''Lev Pitch (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed) * TM Op''''''Lev Yaw (2018/X/XX, Ushiba, Tomaru) * TM Op''''''Lev Length (2018/X/XX, Ushiba, Tomaru) |
Line 163: | Line 130: |
* --(IM PS H1)-- (2018/4/5, Ushiba) * --(IM PS H2)-- (2018/4/5, Ushiba) * --(IM PS H3)-- (2018/4/5, Ushiba) * --(IM PS V1)-- (2018/4/5, Ushiba) * --(IM PS V2)-- (2018/4/5, Ushiba) * --(IM PS V3)-- (2018/4/5, Ushiba) |
* IM PS H1 (2018/X/XX, Ushiba) -> (2018/X/XX planed) * IM PS H2 (2018/X/XX, Ushiba) * IM PS H3 (2018/X/XX, Ushiba) * IM PS V1 (2018/X/XX, Ushiba) * IM PS V2 (2018/X/XX, Ushiba) * IM PS V3 (2018/X/XX, Ushiba) |
Line 170: | Line 137: |
* --(MN PS H1)-- (2018/4/5, Ushiba) * --(MN PS H2)-- (2018/4/6, Ushiba) * --(MN PS H3)-- (2018/4/5, Ushiba) * --(MN PS V1)-- (2018/4/5, Ushiba) * --(MN PS V2)-- (2018/4/5, Ushiba) * --(MN PS V3)-- (2018/4/5, Ushiba) |
* MN PS H1 (2018/X/XX, Ushiba) * MN PS H2 (2018/X/XX, Ushiba) * MN PS H3 (2018/X/XX, Ushiba) * MN PS V1 (2018/X/XX, Ushiba) * MN PS V2 (2018/X/XX, Ushiba) * MN PS V3 (2018/X/XX, Ushiba) |
Line 177: | Line 144: |
* MN Op''''''Lev Pitch (2018/X/XX, Miyamoto) -> (2018/4/12 planed) * MN Op''''''Lev Yaw (2018/X/XX, Miyamoto) -> (2018/4/12 planed) |
* MN Op''''''Lev Pitch (2018/X/XX, Miyamoto) -> (2018/X/XX planed) * MN Op''''''Lev Yaw (2018/X/XX, Miyamoto) |
Line 181: | Line 148: |
* 温度計B (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed) * 温度計C (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed) * 温度計D (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed) * 温度計E (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed) * 温度計F (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed) * 温度計G (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed) * 温度計H (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed) |
* 温度計B (2018/X/XX, Ushiba, Tomaru) * 温度計C (2018/X/XX, Ushiba, Tomaru) * 温度計D (2018/X/XX, Ushiba, Tomaru) * 温度計E (2018/X/XX, Ushiba, Tomaru) * 温度計F (2018/X/XX, Ushiba, Tomaru) * 温度計G (2018/X/XX, Ushiba, Tomaru) * 温度計H (2018/X/XX, Ushiba, Tomaru) |
Line 191: | Line 158: |
* --(TM アクチュエータ H1)-- (2018/4/5, Ushiba) * --(TM アクチュエータ H2)-- (2018/4/5, Ushiba) * --(TM アクチュエータ H3)-- (2018/4/5, Ushiba) * --(TM アクチュエータ H4)-- (2018/4/5, Ushiba) |
* TM アクチュエータ H1 (2018/X/XX, Ushiba) -> (2018/X/XX planed) * TM アクチュエータ H2 (2018/X/XX, Ushiba) * TM アクチュエータ H3 (2018/X/XX, Ushiba) * TM アクチュエータ H4 (2018/X/XX, Ushiba) |
Line 196: | Line 163: |
* --(IM アクチュエータ H1)-- (2018/4/5, Ushiba) * --(IM アクチュエータ H2)-- (2018/4/5, Ushiba) * --(IM アクチュエータ H3)-- (2018/4/5, Ushiba) * --(IM アクチュエータ V1)-- (2018/4/5, Ushiba) * --(IM アクチュエータ V2)-- (2018/4/5, Ushiba) * --(IM アクチュエータ V3)-- (2018/4/5, Ushiba) |
* IM アクチュエータ H1 (2018/X/XX, Ushiba) * IM アクチュエータ H2 (2018/X/XX, Ushiba) * IM アクチュエータ H3 (2018/X/XX, Ushiba) * IM アクチュエータ V1 (2018/X/XX, Ushiba) * IM アクチュエータ V2 (2018/X/XX, Ushiba) * IM アクチュエータ V3 (2018/X/XX, Ushiba) |
Line 203: | Line 170: |
* --(MN アクチュエータ H1)-- (2018/4/5, Ushiba) * --(MN アクチュエータ H2)-- (2018/4/5, Ushiba) * --(MN アクチュエータ H3)-- (2018/4/5, Ushiba) * --(MN アクチュエータ V1)-- (2018/4/5, Ushiba) * --(MN アクチュエータ V2)-- (2018/4/5, Ushiba) * --(MN アクチュエータ V3)-- (2018/4/5, Ushiba) |
* MN アクチュエータ H1 (2018/X/XX, Ushiba) * MN アクチュエータ H2 (2018/X/XX, Ushiba) * MN アクチュエータ H3 (2018/X/XX, Ushiba) * MN アクチュエータ V1 (2018/X/XX, Ushiba) * MN アクチュエータ V2 (2018/X/XX, Ushiba) * MN アクチュエータ V3 (2018/X/XX, Ushiba) |
Line 212: | Line 179: |
* --(MN moving mass1)-- (2018/4/5, Ushiba) * --(MN moving mass2)-- (2018/4/5, Ushiba) * --(PF moving mass1)-- (2018/4/5, Ushiba) * --(PF moving mass2)-- (2018/4/5, Ushiba) |
* MN moving mass1 (2018/8/XX, Ushiba) * MN moving mass2 (2018/8/XX, Ushiba) * PF moving mass1 (2018/8/XX, Ushiba) * PF moving mass2 (2018/8/XX, Ushiba) |
Check list for ITMX vacuum in August, 2018
- Term: ~2018/8/27
Schedule
- 2018/8/16(Thur) 12:30 meeting at fan hut.
- 2018/8/27 : Closing EXC
- 2018/8/??- : pump down
- 2018/8/??: leak check
Each item should have following format;
- item (checked date, checked person)
Once the item has been checked, it will be like:
item (2018/8/20, Somebody)
Preparation of monitors during pump down
Tcam for ITMX (2018/8/?? Inoue) -> (2018/8/XX planed)
Vacuum gage for IXA (2018/4/XX Inoue) -> (2018/8/XX planed)
真空槽の傾きをdial gaugeで測る。 (2018/8/XX Tomaru, Suzuki, Kimura) -> (2018/8/XX planed)
ITMX 機器制御 for status monitors (2018/8/XX Tomaru, Suzuki, Kimura) -> (2018/8/XX planed)
Vacuum gauge monitor at the control room (2018/8/XX Uchiyama, Kimura, Inoue, Miyoki) -> (2018/8/XX planed)
その他追加項目
- Cryo payload EQ stopの隙間のチェック5mm程度 (2018/X/XX, Tomaru)
真空引き後、防振系の動作チェック (2018/X/XX, Enomoto) -> (2018/8/XX planed)
IXA ゲードバルブの動作チェック (2018/X/XX, Uchiyama) -> (2018/8/XX planed)
Type-A tower (高橋)
Fishing rodの動作チェック (2018/4/6, Takahashi)
Tuning of BF (2018/3/26, Takahashi)
Tuning of F3 (2018/3/27, Takahashi)
Tuning of TF (2018/3/27, Takahashi)
Tuning of position of BF damper (2018/3/28, Takahashi)
Centering IP (2018/3/27, Takahashi)
BF yaw picomotorの動作確認 (2018/4/11, Takahashi)
トップ真空槽蓋閉め (2018/3/28, Takahashi)
トップ真空槽ボルト閉め (2018/4/11, Kimura)
クロス菅ボルト閉め (2018/4/11, Kimura)
IPの制御 (2018/4/13, Takahashi)
BFのdamping制御 (2018/4/2, Okutomi) -> (2018/X/XX planed)
BF FRによるmirrorの高さ調整 (2018/4/5, Takahashi)
BF yaw picomotorによるmirrorのyaw調整 (2018/4/5, Ushiba)
事前にTypeA、Cryopayloadのアラインメント機構が動くかどうか確認する。 (2018/4/5, Ushiba)
BF温度計つなぎこみ (2018/4/6, Takahashi, Ushiba)
鏡板閉止 (Kimura)
8K および 80Kシールドにつける窓類の取り付け (2018/4/11 Tomaru)
輻射シールドのシャッター開確認 (2018/4/5, Ushiba)
当該部のSuper Insulation(SI)取り外し確認 (2018/4/12, Kimura)
鏡板取付前の変換フランジ取付 (2018/4/11 Kimura)
鏡板取付後のビューポート取付 (2018/4/12, Akutsu)
Oplev用の島取付 (2018/X/XX, Akutsu) -> (2018/4/12 planed)
EXAチェンバー周り (Inoue)
フォトディテクターの取り外し (2018/3/26, Yokozawa)
GigEカメラの前の真空窓取り外しと取り付け (2018/4/9, Inoue)
EXV支持構造体のセット確認
コーンベローズ脚ロックナットの固定確認 3箇所 (但し、手締め)(2018/4/12, 木村)
チェンバー本体用 3箇所 <- 真空引き前にフリーにする 今回はやらない
真空引き開始前後 (木村)
- 真空フランジを開放し、再度閉止した箇所の確認(リーク試験箇所の確定に必要な情報です。)
- グループ毎の申告による
EXA 鏡板閉止 (2018/4/12, Kimura)
EXV top flange: VIS group (2018/4/11, Kimura)
EXV ICF flange交換 ICF203/NW50 変換フランジ -> ICF203ブランクフランジ : VIS group (2018/3/28, Takahashi)
クロス菅鏡板2箇所: CRY group, VIS group (2018/4/11 Kimura)
ICF253送風機接続ポート: CRY group (2018/4/11 Kimura)
EXC鏡板箇所: CRY group (2018/4/11 Kimura)
EXC鏡板残り1箇所: CRY group (2018/4/12, Kimura) <- 鏡板閉止完了
EXC 鏡板ViewPort 用変換フランジ1箇所:CRY group (2018/4/11, Kimura)
EXC ViewPort 3箇所(鏡板1箇所、容器2箇所): AOS (2018/4/12, Akutsu)
冷凍機NW-50フランジ交換 3箇所: CRY group (2018/4/10, Kimura)
ICF152送風機接続ポート 2箇所: CRY group (2018/4/10 Kimura)
EXA ICF152 2箇所: cal group (2018/4/5-6, Inoue)
ICF253ガスケット交換(リークの疑い有り)1箇所: CRY group (2018/4/11 Kimura)
EYC~クロス管挿しフランジ取り外しとフランジ再締結 (2018/3/12, Kimura)
EYA~EYC間レーザーハザード用挿しフランジ取り外しとフランジ再締結 (2018/3/12, Kimura)
EYAのEYC側ベローズ締結部(寺田さん、内山さんによるビーム位置測定で使用) (2018/3/12, Kimura)
- グループ毎の申告による
- 真空引き
真空計2台 ON (2018/4/13, Kimura)
粗挽きポンプスタート (2018/4/13, Kimura)
大まかなリークチェック (2018/X/XX, Kimura) -> (2018/4/13 planed)
ターボポンプ冷却水循環装置スタート (2018/4/13, Kimura)
ターボポンプスタート (2018/X/XX, Kimura) -> (2018/4/16 planed)
リーク試験 (2018/4/XX, Kimura) -> (2018/4/18-20 planed)
(リーク判定 < 1x10-10 Pa・m3/s)
ゲートバルブ動作試験 (2018/4/XX, Kimura) -> (2018/4/20 planed)
- (温度・圧縮機のモニター)
スタートさせる (2018/XX/XX, 都丸、麻生) -> (2018/X/XX planed)
温度・圧縮機のループテスト (2018/XX/XX, 都丸、麻生、木村) -> 冷却開始前までに予定
Cryo payload (都丸、牛場)
- リリース関係
PFのリリース(16箇所) (2018/X/XX, Tomaru) -> (2018/X/XX planed)
- MNのリリース(16箇所) (2018/X/XX, Tomaru)
- MNRのリリース(16箇所) (2018/X/XX, Tomaru)
- IMのリリース(6箇所) (2018/X/XX, Tomaru)
- IMRのリリース(16箇所) (2018/X/XX, Tomaru)
- TMのリリース(16箇所) (2018/X/XX, Tomaru)
- TMRのリリース(15箇所) (2018/X/XX, Tomaru)
- センサーチェック
TM OpLev Pitch (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed)
TM OpLev Yaw (2018/X/XX, Ushiba, Tomaru)
TM OpLev Length (2018/X/XX, Ushiba, Tomaru)
IM PS H1 (2018/X/XX, Ushiba) -> (2018/X/XX planed)
- IM PS H2 (2018/X/XX, Ushiba)
- IM PS H3 (2018/X/XX, Ushiba)
- IM PS V1 (2018/X/XX, Ushiba)
- IM PS V2 (2018/X/XX, Ushiba)
- IM PS V3 (2018/X/XX, Ushiba)
- MN PS H1 (2018/X/XX, Ushiba)
- MN PS H2 (2018/X/XX, Ushiba)
- MN PS H3 (2018/X/XX, Ushiba)
- MN PS V1 (2018/X/XX, Ushiba)
- MN PS V2 (2018/X/XX, Ushiba)
- MN PS V3 (2018/X/XX, Ushiba)
MN OpLev Pitch (2018/X/XX, Miyamoto) -> (2018/X/XX planed)
MN OpLev Yaw (2018/X/XX, Miyamoto)
温度計A (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed)
- 温度計B (2018/X/XX, Ushiba, Tomaru)
- 温度計C (2018/X/XX, Ushiba, Tomaru)
- 温度計D (2018/X/XX, Ushiba, Tomaru)
- 温度計E (2018/X/XX, Ushiba, Tomaru)
- 温度計F (2018/X/XX, Ushiba, Tomaru)
- 温度計G (2018/X/XX, Ushiba, Tomaru)
- 温度計H (2018/X/XX, Ushiba, Tomaru)
- アクチュエータチェック
TM アクチュエータ H1 (2018/X/XX, Ushiba) -> (2018/X/XX planed)
- TM アクチュエータ H2 (2018/X/XX, Ushiba)
- TM アクチュエータ H3 (2018/X/XX, Ushiba)
- TM アクチュエータ H4 (2018/X/XX, Ushiba)
- IM アクチュエータ H1 (2018/X/XX, Ushiba)
- IM アクチュエータ H2 (2018/X/XX, Ushiba)
- IM アクチュエータ H3 (2018/X/XX, Ushiba)
- IM アクチュエータ V1 (2018/X/XX, Ushiba)
- IM アクチュエータ V2 (2018/X/XX, Ushiba)
- IM アクチュエータ V3 (2018/X/XX, Ushiba)
- MN アクチュエータ H1 (2018/X/XX, Ushiba)
- MN アクチュエータ H2 (2018/X/XX, Ushiba)
- MN アクチュエータ H3 (2018/X/XX, Ushiba)
- MN アクチュエータ V1 (2018/X/XX, Ushiba)
- MN アクチュエータ V2 (2018/X/XX, Ushiba)
- MN アクチュエータ V3 (2018/X/XX, Ushiba)
- SBS ダンピングコイル(V1-V4) (2018/X/XX, Ushiba, Tomaru) 今回は無し
- MN moving mass1 (2018/8/XX, Ushiba)
- MN moving mass2 (2018/8/XX, Ushiba)
- PF moving mass1 (2018/8/XX, Ushiba)
- PF moving mass2 (2018/8/XX, Ushiba)
- ダンピング制御
MN, BFを用いたヒエラリカル制御 (2018/X/XX, Ushiba, Tomaru) -> (2018/X/XX planed)