* Attendance: Miyakawa, Aso, Izumi, Ushiba, Yamamoto * eZuce: Hirose, Tomaru |
* Attendance: Miyakawa, Aso, Izumi, Ushiba, Yamamoto, Koseyama * eZuce: Hirose, Tomaru, Miyoki |
Line 13: | Line 13: |
* Tuning of ETMY is still going on. ETMY yaw motion is still too large. * Trying feedforward, but not so effective. * BF is also tuned. |
|
Line 14: | Line 17: |
* Testing full LSC model started. It will be run at k1imc. * RT model seems to have additional time delay ~61usec to 200usec. Unknown. |
|
Line 15: | Line 21: |
* CAL group also requires iMC in the night. |
|
Line 17: | Line 25: |
* |
Minute of KAGRA commissioning meeting
- Date: 2018/3/13 11AM~12PM
- Attendance: Miyakawa, Aso, Izumi, Ushiba, Yamamoto, Koseyama
- eZuce: Hirose, Tomaru, Miyoki
1. Report of work of the last week and plan of work
- Alignment, ETMY: Izumi
- Tuning of ETMY is still going on. ETMY yaw motion is still too large.
- Trying feedforward, but not so effective.
- BF is also tuned.
- Alignment to REFL port was done.
- Testing full LSC model started. It will be run at k1imc.
- RT model seems to have additional time delay ~61usec to 200usec. Unknown.
- Beam will be checked every night.
- CAL group also requires iMC in the night.
- Some of SUS, specially IMMT showed jumps several times, probably due to duct connection.
- One of the cables for picomotor was cut and broken between the connector and cable, probably due to the duct connection.
- Tuning of ETMY is still going on. ETMY yaw motion is still too large.
- CAL:
- X end PD will be removed. Baffle PD will be located instead. Changing PD will be done around 3/26.
- Effect of Heat link to hardness of Yaw motion(Miyamoto, Ushiba)
- Cryo:
- Current temperature is ~40K. Speed of lowering temperature increased in these 3 days.
2. Schedule of ETMX installtion
- See schedule
- Check list for ETMX, Center.
- Improved point for EMTX should be shared to Vacuum team. It will be listed and shared.
- Bug list is made by izumi-kun, it will be merged to above list.
3. Tasks or discussions
Feed back to BS for MICH
- Experimental side:
- Data analysis side:
- LSC model(Michimura, Izumi)
- Same as iKAGRA or full model?
- CAL model location? which PC?
Selection of storing DAQ channel -> DGS, before phase 1
- Check the total amount.
Screens at control room -> who, when?
- Needs laser safety information.
GW alert: online alert in the control room might be prepared. -> Togoshi
4. Phase2
Others
- Next meeting: 3/13