Minute of KAGRA commissioning meeting


  • Date: 2018/3/13 11AM~12PM
  • Attendance: Miyakawa, Aso, Izumi, Ushiba, Yamamoto, Koseyama
    • eZuce: Hirose, Tomaru, Miyoki


1. Report of work of the last week and plan of work

  • Alignment, ETMY: Izumi
    • Tuning of ETMY is still going on. ETMY yaw motion is still too large.
      • Trying feedforward, but not so effective.
      • BF is also being tuned.
    • Alignment to REFL port was done.
      • Testing full LSC model started. It will be run at k1imc.
    • RT model seems to have additional time delay ~61usec to 200usec. Unknown.
    • Beam will be checked every night.
      • CAL group also requires iMC in the night.
    • Some of SUS, specially IMMT showed jumps several times, probably due to duct connection.
    • One of the flat ribbon cables to picomotor was cut and broken between the connector and cable, probably due to the duct connection.
  • CAL:
    • X end PD was removed. Baffle PD will be located instead. Changing PD will be done around 3/26.
  • Cryo:
    • Current temperature is 18K. Semi equilibrium point exist and it was fallen to the point a week before.

2. Schedule of ETMX installtion

  • See the schedule at the commissioning top page.
    • One missing tool was found, it takes several days, but no delay at schedule.

3. Tasks or discussions

Feed back to BS for MICH

  • Experimental side: no matter.
  • Data analysis side:
  • LSC model(Michimura, Izumi)
    • Full model will be implemented at k1imc.
    • CAL model location? at the same k1imc, or k1test with Dolphin connection.
  • Selection of storing DAQ channel -> DGS, before phase 1

    • Check the total amount.
  • Screens at control room -> who, when?

    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

4. Phase2

Others

  • Next meeting: 3/13