Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2018-03-20 10:42:43
Size: 1988
Comment:
Revision 3 as of 2018-03-20 10:56:40
Size: 1231
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
  * Tuning of ETMY is still going on. ETMY yaw motion is still too large.
   * Trying feedforward, but not so effective.
   * BF is also being tuned.
  * Alignment to REFL port was done.
   * Testing full LSC model started. It will be run at k1imc.
  * RT model seems to have additional time delay ~61usec to 200usec. Unknown.
  * Tuning of ETMY is still going on. ETMY yaw motion is still large.
  * Beam will be checked every night.
Line 20: Line 16:
  * Beam will be checked every night.
   * CAL group also requires iMC in the night.

  * Some of SUS, specially IMMT showed jumps several times, probably due to duct connection.
  * One of the flat ribbon cables to picomotor was cut and broken between the connector and cable, probably due to the duct connection.
 * MIF:
  * LSC full model has been implemented in k1imc.
Line 27: Line 20:
  * X end PD was removed. Baffle PD will be located instead. Changing PD will be done around 3/26.   * Started using IMC as training of calibration.
* X end PD will be removed and Baffle PD will be located instead. Changing PD will be done around 3/26.
Line 30: Line 24:
  * Current temperature is 18K. Semi equilibrium point exist and it was fallen to the point a week before.   * Current temperature is 18K.
Line 35: Line 29:
  * One missing tool was found, it takes several days, but no delay at schedule.
Line 40: Line 33:
=== Feed back to BS for MICH ===
 * Experimental side: no matter.
 * Data analysis side:


 * LSC model(Michimura, Izumi)
  * Full model will be implemented at k1imc.
  * CAL model location? at the same k1imc, or k1test with Dolphin connection.
 * CAL model location? at the same k1imc, or k1test with Dolphin connection.
Line 63: Line 49:
 * Next meeting: 3/13  * Next meeting: 3/27

Minute of KAGRA commissioning meeting


  • Date: 2018/3/20 11AM~12PM
  • Attendance: Miyakawa, Aso, Izumi
    • eZuce:


1. Report of work of the last week and plan of work

  • Alignment, ETMY: Izumi
    • Tuning of ETMY is still going on. ETMY yaw motion is still large.
    • Beam will be checked every night.
  • MIF:
    • LSC full model has been implemented in k1imc.
  • CAL:
    • Started using IMC as training of calibration.
    • X end PD will be removed and Baffle PD will be located instead. Changing PD will be done around 3/26.
  • Cryo:
    • Current temperature is 18K.

2. Schedule of ETMX installtion

  • See the schedule at the commissioning top page.

3. Tasks or discussions

  • CAL model location? at the same k1imc, or k1test with Dolphin connection.
  • Selection of storing DAQ channel -> DGS, before phase 1

    • Check the total amount.
  • Screens at control room -> who, when?

    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

4. Phase2

Others

  • Frequency noise can be measured by middle lock. Large intensity noise can be a problem.
  • Next meeting: 3/27

KAGRA/Commissioning/Weekly/20180320/Minute (last edited 2018-03-20 11:55:44 by OsamuMiyakawa)