= Minute of KAGRA commissioning meeting = ---- * Date: 2018/3/20 11AM~12PM * Attendance: Miyakawa, Aso, Yokozawa, Izumi, Akutsu * eZuce: Ushiba, Suzuki, Tomaru, Inoue, Shoda ----- == 1. Report of work of the last week and plan of work == * Alignment, ETMY: Izumi * Tuning of ETMY is still going on. Currently RMS is ~10urad. * ETMY yaw motion is still large. * Length, Yaw, Translation (diagonal of L) of BF dampings are not easy. * Only Yaw seems to be damped, but combination of them is not going well. * Beam will be checked every night, specially after pump down yesterday. * IMMT1,2 shifted in pitch by ~200urad, in yaw by ~100urad. * MIF: Izumi * LSC full model has been implemented in k1imc0. * CAL model is being tested on k1imc0. * Cal line will be produced in CAL model. * Invisible calibration line will be implemented in LSC model. * k1bs, k1imc will be connected by Dolphin. ETMs are connected to k1imc by RFM. * CAL: Yamamoto, Yokozawa * Started using IMC as training of calibration. * Simple calibration will be implemented. * X end PD will be removed and Baffle PD will be located instead. Changing PD will be done in the week of 3/26. * BURNDY to D-SUB9pin transformer should be implemented. * T cam at Y end is now stopped. It will be fixed soon. T cam X end will start in the next week. Both front T cams are woking. * Cryo: * Current temperature is 18K. == 2. Schedule of ETMX installtion == * See the schedule at the commissioning top page. == 3. Tasks or discussions == * Selection of full channel -> DGS Yamamoto * Selection of science channel -> Commissioning Izumi * Screens at control room * Sensitivity. * PEM. * Needs laser safety information. * GW alert: online alert in the control room might be prepared. -> Togoshi == 4. Phase2 == == Others == * Frequency noise can be measured by middle lock. Large intensity noise can be a problem. * Next meeting: 3/27