 * Attendance: Uchiyama, Yamamoto, Ohashi, Miyoki
  * eZuce: Miyakawa, Shoda, Kimura, Suzuki, Yokozawa, Inoue, Ushiba, Tomaru
 * Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi, Nakano
  * eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura, Miyoki, Tomaru
Line 12: Line 12:
 * Alignment, ETMY: Izumi
  * Mirror motion has been suppressed to ~2urad. Requirement is 1urad.
  * Beam is checked almost every night.
 * IFO: Izumi
  * Beam from both X and Y end was confirmed at REFL port.

 * ETMs: Ushiba
  * ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto).
  * ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday.

 * RT model
  * Cable connection is almost done.
  * Dolphin should be connected as soon as possible. It can stop all models connected Delphin.
  * BS model will be splitted and one of them will be down sampled to 4kHz.

 * Oplev: Ushiba
  * Test mas calibration was done.
  * Length oplev is not ready yet.
  * Marionette Oplev will be calibrated when door closed.

 * CAL: Yamamoto, Yokozawa
  * RT calibration using IMC as training of calibration will be tested soon.
  * Off line calibration using FIR filter won't be used in phase 1.

 * DAQ
  * k1tw0 is sometimes down as like other FWs.
  * SSD will be tested soon.
Line 17: Line 38:
 * MIF: Izumi
  * k1bs, k1imc will be connected by Dolphin. ETMs are connected to k1imc by RFM.
Line 20: Line 39:
 * CAL: Yamamoto, Yokozawa
  * Started using IMC as training of calibration.
   * Simple calibration will be implemented.
  * X end PD is removed at 3/27 today.

 * ETMX:
  * Connection between Type A and Cryopayload is done. Cabling is done.
  * Height somehow changed from the last week to this week. We are fixing it, but it seems to change daily.
  * Alignment will be roughly adjusted today, and first contact will be removed today.
  * Circuits and connection to digital system are done. We started matrix tuning.
  * Viewport of Oplev is missing. It will be placed the next, but we need indium.


== 2. ETMX pump-down ==
 * See the check list.
== 2. IFO check list ==
 * It will be prepared soon.
Line 43: Line 49:
 * DAQ fix -> Miyakawa, Yamamoto
Line 52: Line 59:
 * Frequency noise can be measured by middle lock. Large intensity noise can be a problem.
Line 57: Line 63:
 * Next meeting: 4/3  * Dust monitor using sapphire disk will be implemented around 4/10.
 * Phase 1 summarize should talk wide range view.
 * Monitor for water level, and vacuum gage for weekend should be implemented.
 * Patrol light should be implemented soon, even manual one.
 * Type A stable point.
 * Pump down meeting meeting: 4/5, 4/11
 * Next meeting: 4/10

Minute of KAGRA commissioning meeting


  • Date: 2018/4/3 11AM~12PM
  • Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi, Nakano
    • eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura, Miyoki, Tomaru


1. Report of work of the last week and plan of work

  • IFO: Izumi
    • Beam from both X and Y end was confirmed at REFL port.
  • ETMs: Ushiba
    • ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto).
    • ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday.
  • RT model
    • Cable connection is almost done.
    • Dolphin should be connected as soon as possible. It can stop all models connected Delphin.
    • BS model will be splitted and one of them will be down sampled to 4kHz.
  • Oplev: Ushiba
    • Test mas calibration was done.
    • Length oplev is not ready yet.
    • Marionette Oplev will be calibrated when door closed.
  • CAL: Yamamoto, Yokozawa
    • RT calibration using IMC as training of calibration will be tested soon.
    • Off line calibration using FIR filter won't be used in phase 1.
  • DAQ
    • k1tw0 is sometimes down as like other FWs.
    • SSD will be tested soon.

2. IFO check list

  • It will be prepared soon.

3. Operation

  • Please reply accommodation mail from Uchiyama-san.
  • Think for emergency.

4. Tasks or discussions

  • DAQ fix -> Miyakawa, Yamamoto

  • Selection of full channel -> DGS Yamamoto

  • Selection of science channel -> Commissioning Izumi

  • Screens at control room
    • Sensitivity.
    • PEM.
    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

Others

  • Dust monitor using sapphire disk will be implemented around 4/10.
  • Phase 1 summarize should talk wide range view.
  • Monitor for water level, and vacuum gage for weekend should be implemented.
  • Patrol light should be implemented soon, even manual one.
  • Type A stable point.
  • Pump down meeting meeting: 4/5, 4/11
  • Next meeting: 4/10