← Revision 17 as of 2018-04-03 12:05:59 ⇥
Size: 2234
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Uchiyama, Yamamoto, Ohashi, Miyoki * eZuce: Miyakawa, Shoda, Kimura, Suzuki, Yokozawa, Inoue, Ushiba, Tomaru |
* Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi, Nakano * eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura, Miyoki, Tomaru |
Line 12: | Line 12: |
* Alignment, ETMY: Izumi * Mirror motion has been suppressed to ~2urad. Requirement is 1urad. * Beam is checked almost every night. |
* IFO: Izumi * Beam from both X and Y end was confirmed at REFL port. * ETMs: Ushiba * ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto). * ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday. * RT model * Cable connection is almost done. * Dolphin should be connected as soon as possible. It can stop all models connected Delphin. * BS model will be splitted and one of them will be down sampled to 4kHz. * Oplev: Ushiba * Test mas calibration was done. * Length oplev is not ready yet. * Marionette Oplev will be calibrated when door closed. * CAL: Yamamoto, Yokozawa * RT calibration using IMC as training of calibration will be tested soon. * Off line calibration using FIR filter won't be used in phase 1. * DAQ * k1tw0 is sometimes down as like other FWs. * SSD will be tested soon. |
Line 17: | Line 38: |
* MIF: Izumi * k1bs, k1imc will be connected by Dolphin. ETMs are connected to k1imc by RFM. |
|
Line 20: | Line 39: |
* CAL: Yamamoto, Yokozawa * Started using IMC as training of calibration. * Simple calibration will be implemented. * X end PD is removed at 3/27 today. * ETMX: * Connection between Type A and Cryopayload is done. Cabling is done. * Height somehow changed from the last week to this week. We are fixing it, but it seems to change daily. * Alignment will be roughly adjusted today, and first contact will be removed today. * Circuits and connection to digital system are done. We started matrix tuning. * Viewport of Oplev is missing. It will be placed the next, but we need indium. == 2. ETMX pump-down == * See the check list. |
== 2. IFO check list == * It will be prepared soon. |
Line 43: | Line 49: |
* DAQ fix -> Miyakawa, Yamamoto | |
Line 52: | Line 59: |
* Frequency noise can be measured by middle lock. Large intensity noise can be a problem. | |
Line 57: | Line 63: |
* Next meeting: 4/3 | * Dust monitor using sapphire disk will be implemented around 4/10. * Phase 1 summarize should talk wide range view. * Type A has double stable point. * Monitor for water level, and vacuum gage for weekend should be implemented. * Patrol light should be implemented soon, even manual one. * Gardian of TYPE A must be implemented and tested. * Pump down meeting meeting at Fan hut: 12:30 at 4/5, 12:30 at 4/11 * Next meeting: 4/10 |
Minute of KAGRA commissioning meeting
- Date: 2018/4/3 11AM~12PM
- Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi, Nakano
- eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura, Miyoki, Tomaru
1. Report of work of the last week and plan of work
- IFO: Izumi
- Beam from both X and Y end was confirmed at REFL port.
- ETMs: Ushiba
- ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto).
- ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday.
- RT model
- Cable connection is almost done.
- Dolphin should be connected as soon as possible. It can stop all models connected Delphin.
- BS model will be splitted and one of them will be down sampled to 4kHz.
- Oplev: Ushiba
- Test mas calibration was done.
- Length oplev is not ready yet.
- Marionette Oplev will be calibrated when door closed.
- CAL: Yamamoto, Yokozawa
- RT calibration using IMC as training of calibration will be tested soon.
- Off line calibration using FIR filter won't be used in phase 1.
- DAQ
- k1tw0 is sometimes down as like other FWs.
- SSD will be tested soon.
2. IFO check list
- It will be prepared soon.
3. Operation
- Please reply accommodation mail from Uchiyama-san.
- Think for emergency.
4. Tasks or discussions
DAQ fix -> Miyakawa, Yamamoto
Selection of full channel -> DGS Yamamoto
Selection of science channel -> Commissioning Izumi
- Screens at control room
- Sensitivity.
- PEM.
- Needs laser safety information.
GW alert: online alert in the control room might be prepared. -> Togoshi
Others
- Dust monitor using sapphire disk will be implemented around 4/10.
- Phase 1 summarize should talk wide range view.
- Type A has double stable point.
- Monitor for water level, and vacuum gage for weekend should be implemented.
- Patrol light should be implemented soon, even manual one.
- Gardian of TYPE A must be implemented and tested.
- Pump down meeting meeting at Fan hut: 12:30 at 4/5, 12:30 at 4/11
- Next meeting: 4/10