Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2018-04-03 10:44:08
Size: 1741
Comment:
Revision 8 as of 2018-04-03 11:14:28
Size: 1478
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Uchiyama, Yamamoto, Ohashi, Miyoki
  * eZuce: Miyakawa, Shoda, Kimura, Suzuki, Yokozawa, Inoue, Ushiba, Tomaru
 * Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi
  * eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura
Line 12: Line 12:
 * Alignment, ETMY: Izumi
  * Mirror motion has been suppressed to ~2urad. Requirement is 1urad.
  * Beam is checked almost every night.
 * IFO: Izumi
  * Beam from both X and Y end was confirmed at REFL port.
Line 16: Line 15:
 * ETMs: Ushiba
  * ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto).
  * ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday.
Line 17: Line 19:
 * MIF: Izumi
  * k1bs, k1imc will be connected by Dolphin. ETMs are connected to k1imc by RFM.
 * Oplev:
Line 25: Line 27:
 * ETMX:
  * Connection between Type A and Cryopayload is done. Cabling is done.
  * Height somehow changed from the last week to this week. We are fixing it, but it seems to change daily.
  * Alignment will be roughly adjusted today, and first contact will be removed today.
  * Circuits and connection to digital system are done. We started matrix tuning.
  * Viewport of Oplev is missing. It will be placed the next, but we need indium.
 * RT model

 * DAQ
Line 33: Line 32:
== 2. ETMX pump-down ==
 * See the check list.
== 2. IFO check list ==
 * It will be prepared soon.
Line 43: Line 42:
 * DAQ fix -> Miyakawa, Yamamoto
Line 57: Line 57:
 * Next meeting: 4/3  * Pump down meeting meeting: 4/5, 4/11
 * Next meeting: 4/10

Minute of KAGRA commissioning meeting


  • Date: 2018/4/3 11AM~12PM
  • Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi
    • eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura


1. Report of work of the last week and plan of work

  • IFO: Izumi
    • Beam from both X and Y end was confirmed at REFL port.
  • ETMs: Ushiba
    • ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto).
    • ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday.
  • Oplev:
  • CAL: Yamamoto, Yokozawa
    • Started using IMC as training of calibration.
      • Simple calibration will be implemented.
    • X end PD is removed at 3/27 today.
  • RT model
  • DAQ

2. IFO check list

  • It will be prepared soon.

3. Operation

  • Please reply accommodation mail from Uchiyama-san.
  • Think for emergency.

4. Tasks or discussions

  • DAQ fix -> Miyakawa, Yamamoto

  • Selection of full channel -> DGS Yamamoto

  • Selection of science channel -> Commissioning Izumi

  • Screens at control room
    • Sensitivity.
    • PEM.
    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

  • Frequency noise can be measured by middle lock. Large intensity noise can be a problem.

Others

  • Pump down meeting meeting: 4/5, 4/11
  • Next meeting: 4/10

KAGRA/Commissioning/Weekly/20180403/Minute (last edited 2018-04-03 12:05:59 by OsamuMiyakawa)