* Attendance: Uchiyama, Yamamoto * eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Inoue |
* Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi, Nakano * eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura, Miyoki, Tomaru |
Line 12: | Line 12: |
* IFO: | * IFO: Izumi * Beam from both X and Y end was confirmed at REFL port. |
Line 14: | Line 15: |
* ETMs: Ushiba * ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto). * ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday. |
|
Line 15: | Line 19: |
* ETMs: * Mirror motion has been suppressed less than 2urad. |
* RT model * Cable connection is almost done. * Dolphin should be connected as soon as possible. It can stop all models connected Delphin. * BS model will be splitted and one of them will be down sampled to 4kHz. |
Line 18: | Line 24: |
* Oplev: |
* Oplev: Ushiba * Test mas calibration was done. * Length oplev is not ready yet. * Marionette Oplev will be calibrated when door closed. |
Line 22: | Line 30: |
* Started using IMC as training of calibration. * Simple calibration will be implemented. * X end PD is removed at 3/27 today. * RT model |
* RT calibration using IMC as training of calibration will be tested soon. * Off line calibration using FIR filter won't be used in phase 1. |
Line 29: | Line 34: |
* k1tw0 is sometimes down as like other FWs. * SSD will be tested soon. |
|
Line 51: | Line 59: |
* Frequency noise can be measured by middle lock. Large intensity noise can be a problem. | |
Line 56: | Line 63: |
* Dust monitor using sapphire disk will be implemented around 4/10. * Phase 1 summarize should talk wide range view. * Monitor for water level, and vacuum gage for weekend should be implemented. * Patrol light should be implemented soon, even manual one. * Type A stable point. * Gardian of TYPE A must be implemented and tested. * Pump down meeting meeting at Fan hut: 12:30 at 4/5, 12:30 at 4/11 |
Minute of KAGRA commissioning meeting
- Date: 2018/4/3 11AM~12PM
- Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi, Nakano
- eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura, Miyoki, Tomaru
1. Report of work of the last week and plan of work
- IFO: Izumi
- Beam from both X and Y end was confirmed at REFL port.
- ETMs: Ushiba
- ETMY damping mirror motion has been suppressed to ~1urad in yaw (Miyamoto).
- ETMX has no heat link and is characterized without heat link. Heat link is connected on Thursday.
- RT model
- Cable connection is almost done.
- Dolphin should be connected as soon as possible. It can stop all models connected Delphin.
- BS model will be splitted and one of them will be down sampled to 4kHz.
- Oplev: Ushiba
- Test mas calibration was done.
- Length oplev is not ready yet.
- Marionette Oplev will be calibrated when door closed.
- CAL: Yamamoto, Yokozawa
- RT calibration using IMC as training of calibration will be tested soon.
- Off line calibration using FIR filter won't be used in phase 1.
- DAQ
- k1tw0 is sometimes down as like other FWs.
- SSD will be tested soon.
2. IFO check list
- It will be prepared soon.
3. Operation
- Please reply accommodation mail from Uchiyama-san.
- Think for emergency.
4. Tasks or discussions
DAQ fix -> Miyakawa, Yamamoto
Selection of full channel -> DGS Yamamoto
Selection of science channel -> Commissioning Izumi
- Screens at control room
- Sensitivity.
- PEM.
- Needs laser safety information.
GW alert: online alert in the control room might be prepared. -> Togoshi
Others
- Dust monitor using sapphire disk will be implemented around 4/10.
- Phase 1 summarize should talk wide range view.
- Monitor for water level, and vacuum gage for weekend should be implemented.
- Patrol light should be implemented soon, even manual one.
- Type A stable point.
- Gardian of TYPE A must be implemented and tested.
- Pump down meeting meeting at Fan hut: 12:30 at 4/5, 12:30 at 4/11
- Next meeting: 4/10