Differences between revisions 6 and 7
Revision 6 as of 2018-04-03 11:06:58
Size: 1273
Comment:
Revision 7 as of 2018-04-03 11:11:19
Size: 1350
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Uchiyama, Kokeyama, Yokozawa, Aso  * Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi
Line 12: Line 12:
 * IFO:
 * IFO: Izumi
  * Beam from both X and Y end was confirmed at REFL port.
  *

Minute of KAGRA commissioning meeting


  • Date: 2018/4/3 11AM~12PM
  • Attendance: Uchiyama, Kokeyama, Yokozawa, Aso, Izumi
    • eZuce: Miyakawa, Yamamoto(Kazuhiro), Suzuki, Hirose, Yamamoto, Inoue, Ushiba, Shoda, Kimura


1. Report of work of the last week and plan of work

  • IFO: Izumi
    • Beam from both X and Y end was confirmed at REFL port.
  • ETMs:
    • Mirror motion has been suppressed less than 2urad.
  • Oplev:
  • CAL: Yamamoto, Yokozawa
    • Started using IMC as training of calibration.
      • Simple calibration will be implemented.
    • X end PD is removed at 3/27 today.
  • RT model
  • DAQ

2. IFO check list

  • It will be prepared soon.

3. Operation

  • Please reply accommodation mail from Uchiyama-san.
  • Think for emergency.

4. Tasks or discussions

  • DAQ fix -> Miyakawa, Yamamoto

  • Selection of full channel -> DGS Yamamoto

  • Selection of science channel -> Commissioning Izumi

  • Screens at control room
    • Sensitivity.
    • PEM.
    • Needs laser safety information.
  • GW alert: online alert in the control room might be prepared. -> Togoshi

  • Frequency noise can be measured by middle lock. Large intensity noise can be a problem.

Others

  • Pump down meeting meeting: 4/5, 4/11
  • Next meeting: 4/10

KAGRA/Commissioning/Weekly/20180403/Minute (last edited 2018-04-03 12:05:59 by OsamuMiyakawa)